Thermography research in EPS power system installations

The paper presents summary results of systematic thermography inspections conducted in EPS power system installations for voltage levels ranging from 35 kV to 400 kV in the last ten years, The presented data are given in cronological order and they are result of long term research that is important not only for the equipment users but also for the equipment manufacturers.