Scheduling hybrid flow shop problem with non-fixed availability constraints
暂无分享,去创建一个
[1] Ceyda Oguz,et al. A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks , 2005, J. Sched..
[2] Chung-Yee Lee,et al. Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint , 1997, Oper. Res. Lett..
[3] Abdelhakim Artiba,et al. Scheduling two-stage hybrid flow shop with availability constraints , 2006, Comput. Oper. Res..
[4] J. Teghem,et al. Using Genetic Algorithm in the Multiprocessor Flow Shop to Minimize the Makespan , 2006, 2006 International Conference on Service Systems and Service Management.
[5] Riad Aggoune,et al. Minimizing the makespan for the flow shop scheduling problem with availability constraints , 2001, Eur. J. Oper. Res..
[6] Günter Schmidt,et al. Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..
[7] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[8] Rubén Ruiz,et al. Considering scheduling and preventive maintenance in the flowshop sequencing problem , 2007, Comput. Oper. Res..
[9] Chung-Yee Lee,et al. Machine scheduling with an availability constraint , 1996, J. Glob. Optim..
[10] Richard M. Karp,et al. Reducibility Among Combinatorial Problems , 1972, 50 Years of Integer Programming.
[11] Gupta J.N.D.. TWO-STAGE HYBRID FLOW SHOP SCHEDULING PROBLEM , 1988 .
[12] Jean-Charles Billaut,et al. Les problèmes d'ordonnancement de type flow-shop hybride : état de l'art , 1999, RAIRO Oper. Res..
[13] George L. Vairaktarakis,et al. Minimizing makespan in hybrid flowshops , 1994, Oper. Res. Lett..
[14] Ronald L. Graham,et al. Bounds for certain multiprocessing anomalies , 1966 .
[15] Abdelhakim Artiba,et al. Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints , 2004, Comput. Ind. Eng..
[16] Chung-Yee Lee. Two-machine flowshop scheduling with availability constraints , 1999, Eur. J. Oper. Res..
[17] Chien-Hung Lin,et al. Makespan minimization for two parallel machines with an availability constraint , 2005, Eur. J. Oper. Res..
[18] Jan Karel Lenstra,et al. PREEMPTIVE SCHEDULING IN A TWO-STAGE MULTIPROCESSOR FLOW SHOP IS NP-HARD , 1996 .
[19] Rubén Ruiz,et al. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility , 2006, European Journal of Operational Research.