A survey of the self-balancing production lines (“bucket brigades”)
暂无分享,去创建一个
[1] Donald D. Eisenstein,et al. Performance of Bucket Brigades When Work Is Stochastic , 2001, Oper. Res..
[2] Donald D. Eisenstein,et al. BUCKET BRIGADES A self-organizing scheme for sharing work , 1996 .
[3] Leonid A. Bunimovich. Controlling Production Lines , 2006 .
[4] Diane P. Bischak. Performance of a manufacturing module with moving workers , 1996 .
[5] J. Boomsma,et al. Task partitioning in insect societies: bucket brigades , 2002, Insectes Sociaux.
[6] Antoneta Iuliana Bratcu. ON THE MODELLING OF BUCKET BRIGADES , 2002 .
[7] Emanuel Falkenauer,et al. A hybrid grouping genetic algorithm for bin packing , 1996, J. Heuristics.
[8] Donald D. Eisenstein,et al. A Production Line that Balances Itself , 1996, Oper. Res..
[9] J. L. Reyes,et al. Sequential co-operative load transport in the seed-harvesting ant Messor barbarus , 1999, Insectes Sociaux.
[10] Ilker Baybars,et al. A survey of exact algorithms for the simple assembly line balancing , 1986 .
[11] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[12] Mario G. Beruvides,et al. EFFECTS OF HIGH LABOUR TURNOVER IN A SERIAL ASSEMBLY ENVIRONMENT , 1997 .
[13] Alexandre Dolgui,et al. Synergy, Collaboration and Self-Balancing in Production Systems - The Bucket Brigades , 2003 .
[14] John O. McClain,et al. Self-buffering, self-balancing, self-flushing production lines , 1996 .
[15] Guanrong Chen. Controlling Chaos and Bifurcations in Engineering Systems , 1999 .
[16] Jrjung Lyu. A single-run optimization algorithm for stochastic assembly line balancing problems , 1997 .
[17] J. Rene Villalobos,et al. Work allocation strategies for serial assembly lines under high labour turnover , 2002 .
[18] Leonid A. Bunimovich. Dynamical systems and operations research: A basic model , 2001 .
[19] V. Minzu,et al. A look at self-balancing manufacturing lines through theory of hybrid dynamical systems , 2001, Proceedings of the 2001 IEEE International Symposium on Assembly and Task Planning (ISATP2001). Assembly and Disassembly in the Twenty-first Century. (Cat. No.01TH8560).
[20] Brahim Rekiek,et al. State of art of optimization methods for assembly line design , 2002, Annu. Rev. Control..
[21] Leonid A. Bunimovich,et al. Dynamics of Two- and Three-Worker "Bucket Brigade" Production Lines , 1999, Oper. Res..
[22] Wallace J. Hopp,et al. Performance Opportunity for Workforce Agility in Collaborative and Noncollaborative Work Systems , 2001 .
[23] Donald D. Eisenstein,et al. Bucket brigades on in-tree assembly networks , 2006, Eur. J. Oper. Res..
[24] Kenneth L. Schultz,et al. Modeling and worker motivation in JIT production systems , 1998 .
[25] Sowmyanarayanan Sadagopan,et al. WWW: service provider , 2002, UBIQ.