Yard crane and AGV scheduling in automated container terminal: A multi-robot task allocation framework
暂无分享,去创建一个
Pan Shang | Xuesong Zhou | Yongxiang Zhang | Xuchao Chen | Shiwei He | Lu Tong | Shiwei He | Pan Shang | Xuesong Zhou | Xuchao Chen | L. Tong | Yongxiang Zhang
[1] Lixin Tang,et al. Modeling and solution of the joint quay crane and truck scheduling problem , 2014, Eur. J. Oper. Res..
[2] Nuzhet Atay,et al. Mixed-Integer Linear Programming Solution to Multi-Robot Task Allocation Problem , 2006 .
[3] Nils Boysen,et al. A generalized classification scheme for crane scheduling with interference , 2017, Eur. J. Oper. Res..
[4] Héctor J. Carlo,et al. Priority rules for twin automated stacking cranes that collaborate , 2015, Comput. Ind. Eng..
[5] Chung-Lun Li,et al. Analysis of a new vehicle scheduling and location problem , 2001 .
[6] Iris F. A. Vis,et al. Sequencing Two Cooperating Automated Stacking Cranes in a Container Terminal , 2010, Transp. Sci..
[7] Youfang Huang,et al. Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption , 2015, Expert Syst. Appl..
[8] Youfang Huang,et al. A simulation optimization method for internal trucks sharing assignment among multiple container terminals , 2013, Adv. Eng. Informatics.
[9] M. F. Monaco,et al. A tabu search heuristic for the quay crane scheduling problem , 2007 .
[10] W. C. Ng,et al. Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..
[11] Chung-Lun Li,et al. Loading and unloading operations in container terminals , 2004 .
[12] Stephen P. Boyd,et al. Distributed Optimization and Statistical Learning via the Alternating Direction Method of Multipliers , 2011, Found. Trends Mach. Learn..
[13] Carlos F. Daganzo,et al. A branch and bound solution method for the crane scheduling problem , 1990 .
[14] Kees Jan Roodbergen,et al. Storage yard operations in container terminals: Literature overview, trends, and research directions , 2014, Eur. J. Oper. Res..
[15] Qingcheng Zeng,et al. Integrating simulation and optimization to schedule loading operations in container terminals , 2009, Comput. Oper. Res..
[16] Pan Shang,et al. Open-Source Public Transportation Mobility Simulation Engine DTALite-S: A Discretized Space–Time Network-Based Modeling Framework for Bridging Multi-agent Simulation and Optimization , 2019, Urban Rail Transit.
[17] Nils Boysen,et al. RMG vs. DRMG: an evaluation of different crane configurations in intermodal transshipment yards , 2015, EURO J. Transp. Logist..
[18] Der-Horng Lee,et al. A heuristic algorithm for yard truck scheduling and storage allocation problems , 2009 .
[19] Christian Bierwirth,et al. A Framework for Integrated Berth Allocation and Crane Operations Planning in Seaport Container Terminals , 2013, Transp. Sci..
[20] Cosmin G. Petra,et al. On Parallelizing Dual Decomposition in Stochastic Integer Programming , 2012, Oper. Res. Lett..
[21] Nathan Huynh,et al. An efficient genetic algorithm for solving the quay crane scheduling problem , 2012, Expert Syst. Appl..
[22] Kees Jan Roodbergen,et al. Seaside operations in container terminals: literature overview, trends, and research directions , 2015 .
[23] Ismail Chabini,et al. Discrete Dynamic Shortest Path Problems in Transportation Applications: Complexity and Algorithms with Optimal Run Time , 1998 .
[24] Michael G.H. Bell,et al. An uncertainty-aware AGV assignment algorithm for automated container terminals , 2010 .
[25] Jesper Larsen,et al. The vehicle routing problem with time windows and temporal dependencies , 2011, Networks.
[26] Lixin Miao,et al. Quay crane scheduling with non-interference constraints in port container terminals , 2008 .
[27] Jesper Larsen,et al. The Home Care Crew Scheduling Problem: Preference-based visit clustering and temporal dependencies , 2012, Eur. J. Oper. Res..
[28] Pasquale Legato,et al. Modeling and solving rich quay crane scheduling problems , 2012, Comput. Oper. Res..
[29] Christos Katrakazas,et al. Real-time motion planning methods for autonomous on-road driving: State-of-the-art and future research directions , 2015 .
[30] Anthony Stentz,et al. Time-extended multi-robot coordination for domains with intra-path constraints , 2009, Robotics: Science and Systems.
[31] Javier Alonso-Mora,et al. A message-passing algorithm for multi-agent trajectory planning , 2013, NIPS.
[32] Carlos F. Daganzo,et al. THE CRANE SCHEDULING PROBLEM , 1989 .
[33] Der-Horng Lee,et al. Heuristics for quay crane scheduling at indented berth , 2011 .
[34] Christian Artigues,et al. Insertion techniques for static and dynamic resource-constrained project scheduling , 2003, Eur. J. Oper. Res..
[35] Li-feng Xi,et al. A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time , 2010, Eur. J. Oper. Res..
[36] Nils Boysen,et al. Jena Research Papers in Business and Economics Determining fixed Crane Areas in Rail-Rail Transshipment Yards , 2009 .
[37] Kap Hwan Kim,et al. A dispatching method for automated lifting vehicles in automated port container terminals , 2009, Comput. Ind. Eng..
[38] Pan Shang,et al. Integrating Lagrangian and Eulerian observations for passenger flow state estimation in an urban rail transit network: A space-time-state hyper network-based assignment approach , 2019, Transportation Research Part B: Methodological.
[39] Sven Koenig,et al. Sequential Bundle-Bid Single-Sale Auction Algorithms for Decentralized Control , 2007, IJCAI.
[40] Mark Goh,et al. Discrete time model and algorithms for container yard crane scheduling , 2009, Eur. J. Oper. Res..
[41] Sven Koenig,et al. Robot exploration with combinatorial auctions , 2003, Proceedings 2003 IEEE/RSJ International Conference on Intelligent Robots and Systems (IROS 2003) (Cat. No.03CH37453).
[42] George L. Nemhauser,et al. Congestion-aware dynamic routing in automated material handling systems , 2014, Comput. Ind. Eng..
[43] Xin Zhang,et al. Solving cyclic train timetabling problem through model reformulation: Extended time-space network construct and Alternating Direction Method of Multipliers methods , 2019, Transportation Research Part B: Methodological.
[44] Xiaomin Li,et al. Multi-robot Task Allocation Based on Ant Colony Algorithm , 2012, J. Comput..
[45] Chung-Cheng Lu,et al. A Dynamic and Flexible Berth Allocation Model with Stochastic Vessel Arrival Times , 2019, Networks and Spatial Economics.
[46] Nils Boysen,et al. A survey on single crane scheduling in automated storage/retrieval systems , 2016, Eur. J. Oper. Res..
[47] João M. F. Xavier,et al. D-ADMM: A Communication-Efficient Distributed Algorithm for Separable Optimization , 2012, IEEE Transactions on Signal Processing.
[48] Ebru K. Bish,et al. A multiple-crane-constrained scheduling problem in a container terminal , 2003, Eur. J. Oper. Res..
[49] Alaa M. Khamis,et al. A Comparative Study between Optimization and Market-Based Approaches to Multi-Robot Task Allocation , 2013, Adv. Artif. Intell..
[50] Qiang Meng,et al. Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals , 2008 .
[51] Önder Bulut,et al. A dynamic rationing policy for continuous-review inventory systems , 2010, Eur. J. Oper. Res..
[52] Weijian Mi,et al. A hybrid parallel genetic algorithm for yard crane scheduling , 2010 .
[53] Arni Halldorsson,et al. Storage and stacking logistics problems in container terminals , 2011, OR Insight.
[54] Rudy R. Negenborn,et al. Fast ADMM for Distributed Model Predictive Control of Cooperative Waterborne AGVs , 2017, IEEE Transactions on Control Systems Technology.
[55] Pan Shang,et al. Equity-oriented skip-stopping schedule optimization in an oversaturated urban rail transit network , 2018 .
[56] André Langevin,et al. Integrated scheduling of crane handling and truck transportation in a maritime container terminal , 2013, Eur. J. Oper. Res..
[57] Christian Bierwirth,et al. A fast heuristic for quay crane scheduling with interference constraints , 2009, J. Sched..
[58] Xuesong Zhou,et al. Single-Track Train Timetabling with Guaranteed Optimality: Branch-and-Bound Algorithms with Enhanced Lower Bounds , 2007 .
[59] Marshall L. Fisher,et al. The Lagrangian Relaxation Method for Solving Integer Programming Problems , 2004, Manag. Sci..
[60] Carlos F. Daganzo,et al. Using Input-Output Diagram To Determine Spatial and Temporal Extents of a Queue Upstream of a Bottleneck , 1997 .
[61] Brian Kallehauge,et al. Formulations and exact algorithms for the vehicle routing problem with time windows , 2008, Comput. Oper. Res..
[62] Kap Hwan Kim,et al. Load scheduling for multiple quay cranes in port container terminals , 2006, J. Intell. Manuf..
[63] H. Christopher Frey,et al. Integrating a simplified emission estimation model and mesoscopic dynamic traffic simulator to efficiently evaluate emission impacts of traffic management strategies , 2015 .
[64] Marshall L. Fisher,et al. Vehicle Routing with Time Windows: Two Optimization Algorithms , 1997, Oper. Res..
[65] Matteo Fischetti,et al. Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..
[66] Zuhua Jiang,et al. Developing a dynamic rolling-horizon decision strategy for yard crane scheduling , 2011, Adv. Eng. Informatics.
[67] Chung-Cheng Lu,et al. Eco-system optimal time-dependent flow assignment in a congested network , 2016 .
[68] Kwang Ryel Ryu,et al. Real-time scheduling for twin RMGs in an automated container yard , 2010, OR Spectr..
[69] Xuesong Zhou,et al. Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach , 2011 .
[70] Ravindra K. Ahuja,et al. Network Flows: Theory, Algorithms, and Applications , 1993 .
[71] Ali H. Diabat,et al. A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach , 2014, Expert Syst. Appl..
[72] Lifeng Xi,et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal , 2007, Eur. J. Oper. Res..
[73] G. Ayorkor Korsah,et al. Exploring Bounded Optimal Coordination for Heterogeneous Teams with Cross-Schedule Dependencies , 2011 .
[74] Nils Boysen,et al. Jena Research Papers in Business and Economics Determining Crane Areas in Intermodal Transshipment Yards : The Yard Partition Problem , 2009 .
[75] Gilbert Laporte,et al. Scheduling Twin Yard Cranes in a Container Block , 2015, Transp. Sci..
[76] Ahmed M. Elmogy,et al. Multi-robot Task Allocation: A Review of the State-of-the-Art , 2015, Advances in Social Media Analysis.
[77] K. L. Mak,et al. Yard crane scheduling in port container terminals , 2005 .
[78] Mark Goh,et al. An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem , 2014, Eur. J. Oper. Res..
[79] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[80] Hani S. Mahmassani,et al. Time dependent, shortest-path algorithm for real-time intelligent vehicle highway system applications , 1993 .
[81] Ceyda Oguz,et al. Constraint programming approach to quay crane scheduling problem , 2013 .
[82] Youfang Huang,et al. An investigation into knowledge-based yard crane scheduling for container terminals , 2011, Adv. Eng. Informatics.
[83] Xuesong Zhou,et al. Finding Optimal Solutions for Vehicle Routing Problem with Pickup and Delivery Services with Time Windows: A Dynamic Programming Approach Based on State-space-time Network Representations , 2015, ArXiv.
[84] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[85] Der-Horng Lee,et al. The Integrated Yard Truck and Yard Crane Scheduling Problem: Benders' Decomposition-Based Methods , 2010 .
[86] Dimitri P. Bertsekas,et al. Nonlinear Programming , 1997 .
[87] Huimin Niu,et al. Coordinating assignment and routing decisions in transit vehicle schedules: A variable-splitting Lagrangian decomposition approach for solution symmetry breaking , 2018 .
[88] Mark Goh,et al. Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement , 2015, Transp. Sci..
[89] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..
[90] Leo Kroon,et al. A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage , 2016 .
[91] Peter B. Luh,et al. A Scalable Solution Methodology for Mixed-Integer Linear Programming Problems Arising in Automation , 2019, IEEE Transactions on Automation Science and Engineering.
[92] Li Wang,et al. Integrated Scheduling of Rail-Mounted Gantry Cranes, Internal Trucks and Reach Stackers in Railway Operation Area of Container Terminal , 2018, Transportation Research Record: Journal of the Transportation Research Board.
[93] Christian Bierwirth,et al. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals , 2015, Eur. J. Oper. Res..
[94] Xiaoning Zhu,et al. ADMM-based problem decomposition scheme for vehicle routing problem with time windows , 2019, Transportation Research Part B: Methodological.
[95] Qiang Meng,et al. Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm , 2007 .
[96] Amir Hossein Gharehgozli,et al. A simulation study of the performance of twin automated stacking cranes at a seaport container terminal , 2017, Eur. J. Oper. Res..