A Transient Coupled Wellbore-Reservoir Model Using a Dynamic IPR Function
暂无分享,去创建一个
A. Posenato Garcia | P. Cavalcanti de Sousa | Paulo J. Waltrich | A. Posenato Garcia | P. Cavalcanti de Sousa
[1] Bulent Izgec. Transient Fluid and Heat Flow Modeling in Coupled Wellbore/Reservoir Systems , 2006 .
[2] Bin Hu,et al. Integrated Wellbore/Reservoir Dynamic Simulation , 2007 .
[3] Artur Posenato Garcia,et al. Dynamic IPR - Modeling Reservoir Well Interactions to Improve Transient Simulations of Wells , 2014 .
[4] Paulo J. Waltrich,et al. A Simplified Transient Model to Predict Liquid Loading in Gas Wells , 2016 .
[5] J. Sagen,et al. A Coupled Dynamic Reservoir and Pipeline Model – Development and Initial Experience , 2007 .
[6] R. Vepa,et al. On the use of Pade approximants to represent unsteady aerodynamic loads for arbitrarily small motions of wings , 1976 .
[7] Ole Morten Aamo,et al. On Instability in Gas Lift Wells and Schemes for Stabilization by Automatic Control , 2008 .
[8] Stefan Belfroid,et al. An Investigation Into the Need of a Dynamic Coupled Well-Reservoir Simulator , 2007 .
[9] Mehdi Bahonar,et al. Transient Nonisothermal Fully Coupled Wellbore/Reservoir Model for Gas-Well Testing, Part 1: Modelling , 2011 .