Risk assessment and mitigation for the Hongshiyan landslide dam triggered by the 2014 Ludian earthquake in Yunnan, China

An Ms 6.5 earthquake shocked the Ludian County, Yunnan Province, China, on 3 August 2014 and triggered the Hongshiyan landslide dam. The dam, with a height of 83 m and a lake capacity of 260 × 106 m3, threatened more than 10,000 people. A unique feature of this landslide dam was that it formed between a man-made dam and a hydropower plant. An existing drainage tunnel connecting the lake and the hydropower plant became a natural drainage conduit for the landslide dam, which played an important role in the mitigation of the landslide dam risks. This paper reports a quantitative risk assessment for the Hongshiyan landslide dam considering both engineering and non-engineering risk mitigation measures. The risk assessment is divided into three stages according to the implementation of two engineering measures: construction of a diversion channel and excavation of a branch drainage tunnel. The dam breaching hydrographs, flood zones, population at risk, and likely fatalities in each of the three stages are analysed. The optimum evacuation strategy in each stage is also studied based on the principle of minimum total consequence. It is found that the diversion channel decreases the dam breaching peak discharge and the associated risks significantly. The branch drainage tunnel prevent the landslide dam from overtopping failure in non-flooded period; however, the landslide dam may fail by overtopping in a future flood if the inflow rate is larger than the outflow rate through the drainage tunnels, resulting in serious losses of lives and properties. The dam breaching risks in all the three stages could be largely reduced by the optimal evacuation decision, which shows that timely evacuation is vital to save life and properties. The study provides a scientific basis for decision making in landslide dam risk management.

[1]  X. An,et al.  Contributing factors to the failure of an unusually large landslide triggered by the 2014 Ludian, Yunnan, China, M s = 6.5 earthquake , 2016 .

[2]  X. An,et al.  Why the 2014 Ludian, Yunnan, China M s 6.5 earthquake triggered an unusually large landslide? , 2015 .

[3]  Li Min Zhang,et al.  Analysis of human risks due to dam break floods—part 2: application to Tangjiashan landslide dam failure , 2012, Natural Hazards.

[4]  Li Min Zhang,et al.  Dynamic decision making for dam-break emergency management – Part 1: Theoretical framework , 2013 .

[5]  David N. Petley,et al.  Formation and failure of the Tsatichhu landslide dam, Bhutan , 2006 .

[6]  Oliver Korup,et al.  Recent research on landslide dams - a literature review with special attention to New Zealand , 2002 .

[7]  S. Evans,et al.  Engineering Measures for the Hazard Reduction of Landslide Dams , 2011 .

[8]  Sebastiaan N. Jonkman,et al.  Loss of life estimation in flood risk assessment; theory and applications , 2007 .

[9]  L. Zhang,et al.  Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure , 2013 .

[10]  John E. Costa,et al.  The formation and failure of natural dams , 1988 .

[11]  B. I. Frieser,et al.  Probabilistic Evacuation Decision Model for River Floods in the Netherlands , 2004 .

[12]  Nicola Casagli,et al.  Prediction of the behaviour of landslide dams using a geomorphological dimensionless index , 2003 .

[13]  Si-ming He,et al.  A two-layer model for simulating landslide dam over mobile river beds , 2016, Landslides.

[14]  Finn V. Jensen,et al.  Bayesian Networks and Decision Graphs , 2001, Statistics for Engineering and Information Science.

[15]  Li Min Zhang,et al.  Analysis of human risks due to dam-break floods—part 1: a new model based on Bayesian networks , 2012, Natural Hazards.

[16]  L. Zhang,et al.  Simulation of the erosion process of landslide dams due to overtopping considering variations in soil erodibility along depth. , 2010 .

[17]  Li Min Zhang,et al.  Multi-hazard scenarios and consequences in Beichuan, China: The first five years after the 2008 Wenchuan earthquake , 2014 .

[18]  D. Chang,et al.  Engineering risk mitigation measures for the landslide dams induced by the 2008 Wenchuan earthquake , 2014 .

[19]  Ming Peng,et al.  Breaching parameters of landslide dams , 2012, Landslides.

[20]  S. Evans,et al.  The Formation and Behaviour of Natural and Artificial Rockslide Dams; Implications for Engineering Performance and Hazard Management , 2011 .

[21]  Xiaoqing Chen,et al.  The 12 May Wenchuan earthquake-induced landslide lakes: distribution and preliminary risk evaluation , 2009 .