Evaluation of final test process in 64-Mbit DRAM manufacturing system through simulation analysis
暂无分享,去创建一个
[1] Koji Nakamae,et al. TAT- and cost-reduction strategies in LSI manufacturing test process , 1999, 10th Annual IEEE/SEMI. Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 99 Proceedings (Cat. No.99CH36295).
[2] Koji Nakamae,et al. Effect of 300 mm wafer and small lot size on final test process efficiency and cost of LSI manufacturing system , 1998, IEEE/SEMI 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (Cat. No.98CH36168).
[3] Koji Nakamae,et al. Effect of express lots on production dispatching rule scheduling and cost in final test process of LSI manufacturing system , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).
[4] Koji Nakamae,et al. Effects of operator grouping on the VLSI final test facility layout scale , 2000, 2000 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop. ASMC 2000 (Cat. No.00CH37072).
[5] Koji Nakamae,et al. Effects of multi-product, small-sized production of LSIs packaged in various packages on the final test process efficiency and cost , 1996, Proceedings International Test Conference 1996. Test and Design Validity.