An adaptable automated procedure for short-term electricity load forecasting
暂无分享,去创建一个
[1] N. Draper,et al. Applied Regression Analysis , 1966 .
[2] D. P. Lijesen,et al. Adaptive Forecasting of Hourly Loads Based on Load Measurements and Weather Information , 1971 .
[3] R. R. Hocking. The analysis and selection of variables in linear regression , 1976 .
[4] D. Kleinbaum,et al. Applied Regression Analysis and Other Multivariate Methods , 1978 .
[5] Donald G. Watts,et al. Meaningful Multicollinearity Measures , 1978 .
[6] W. W. Muir,et al. Regression Diagnostics: Identifying Influential Data and Sources of Collinearity , 1980 .
[7] Roy E. Welsch,et al. Efficient Computing of Regression Diagnostics , 1981 .
[8] T. Hassard,et al. Applied Linear Regression , 2005 .
[9] S. Weisberg,et al. Residuals and Influence in Regression , 1982 .
[10] Kenneth A. Bollen,et al. Regression Diagnostics , 1985 .
[11] John Fox,et al. Linear Statistical Models and Related Methods; With Applications to Social Research. , 1985 .
[12] J. Fox,et al. Linear Statistical Models and Related Methods: With Applications to Social Research. , 1986 .
[13] G. Gross,et al. Short-term load forecasting , 1987, Proceedings of the IEEE.
[14] K. Jabbour,et al. ALFA: automated load forecasting assistant , 1988 .
[15] T. Hesterberg,et al. A regression-based approach to short-term system load forecasting , 1989, Conference Papers Power Industry Computer Application Conference.
[16] O. Hyde,et al. An Electricity Load Forecasting System , 1991 .
[17] O. Hyde,et al. Rule-based procedures in short-term electricity load forecasting , 1993 .