Performance and Evaluation of Manufacturing Systems

[1]  Andy Neely,et al.  Performance measurement frameworks: A review , 2007 .

[2]  Suh Nam-pyo,et al.  Complexity: Theory and Applications , 2005 .

[3]  Ruth Jill Urbanic,et al.  Assessment of Manufacturing Operational Complexity , 2004 .

[4]  Dailun Shi,et al.  A survey of manufacturing flexibility: Implications for e-business flexibility , 2003, IBM Syst. J..

[5]  Jack P. C. Kleijnen,et al.  Performance metrics in supply chain management , 2003, J. Oper. Res. Soc..

[6]  Samuel H. Huang,et al.  Manufacturing productivity improvement using effectiveness metrics and simulation analysis , 2003 .

[7]  J. Peklenik Cybernetic Structures, Networks, and Adaptive Control of Work Systems in Manufacturing , 2003 .

[8]  Waguih ElMaraghy,et al.  Modelling of Manufacturing Systems Complexity , 2003 .

[9]  Janet Efstathiou,et al.  A web-based expert system to assess the complexity of manufacturing organizations , 2002 .

[10]  Kimon P. Valavanis,et al.  On the Measurement of Enterprise Agility , 2002, J. Intell. Robotic Syst..

[11]  Yahaya Yusuf,et al.  A comparative study of lean and agile manufacturing with a related survey of current practices in the UK , 2002 .

[12]  Bernard Hon Design and Manufacture for Sustainable Development 2004 , 2002 .

[13]  Nobutada Fujii,et al.  Facility Layout Planning Using Self-Organization Method , 2002 .

[14]  Andy Neely,et al.  Business performance measurement: Performance measurement – practical applications , 2002 .

[15]  K.K.B. Hon,et al.  Configuration of Manufacturing Cells for Dynamic Manufacturing , 2002 .

[16]  H. Wiendahl,et al.  Production in Networks , 2002 .

[17]  Kate Blackmon,et al.  Small firms under MICROSCOPE: international differences in production/operations management practices and performance , 2001 .

[18]  R. Kaplan,et al.  The strategy-focused organization , 2000 .

[19]  Yi-Chih Hsieh,et al.  An approach to the measurement of single-machine flexibility , 2001 .

[20]  Manoochehr Najmi,et al.  The role of performance measurement systems in promoting quality development beyond ISO 9000 , 2001 .

[21]  Ashok Kumar,et al.  A review and analysis of the state-of-the-art research on productivity measurement , 2000, Ind. Manag. Data Syst..

[22]  Derek Steeple,et al.  A FRAMEWORK FOR AUDITING AND ENHANCING PERFORMANCE MEASUREMENT SYSTEMS , 2000 .

[23]  Luke Georghiou,et al.  Evaluating technology programs: tools and methods , 2000 .

[24]  Nobutada Fujii,et al.  Reinforcement Learning Approaches to Biological Manufacturing Systems , 2000 .

[25]  David S. Cochran,et al.  THE IMPACT OF PERFORMANCE MEASUREMENT ON MANUFACTURING SYSTEM DESIGN , 2000 .

[26]  Ian P. McCarthy,et al.  Complex systems theory: implications and promises for manufacturing organisations , 2000, Int. J. Manuf. Technol. Manag..

[27]  J. P. Shewchuk A set of generic flexibility measures for manufacturing applications , 1999 .

[28]  Chris J. Backhouse,et al.  Agile value chains for manufacturing – implications for performance measures , 1999 .

[29]  R. Kasilingam,et al.  Logistics and Transportation: Design and planning , 1999 .

[30]  Jo Wyns,et al.  Reference architecture for holonic manufacturing systems, the key to support evolution and reconfiguration , 1999 .

[31]  Duncan McFarlane,et al.  Assessing and improving the responsiveness of manufacturing production systems , 1999 .

[32]  Luc Bongaerts,et al.  Reference architecture for holonic manufacturing systems: PROSA , 1998 .

[33]  Sameh M. Saad,et al.  Flexibility and responsiveness of machining environments , 1998 .

[34]  Stefano Tonchia,et al.  Manufacturing flexibility: A literature review , 1998 .

[35]  Andrea Matta,et al.  A Method for Performance Evaluation of Automated Flow Lines , 1998 .

[36]  Kate Blackmon,et al.  Benchmarking and operational performance: some empirical results , 1997 .

[37]  Barry Povey,et al.  Benchmarking: A tool for continuous improvement , 1997 .

[38]  M. Malone,et al.  Intellectual Capital: Realizing Your Company's True Value by Finding Its Hidden Brainpower , 1997 .

[39]  h.c.E. Westkämpfer,et al.  Manufacturing on Demand in Production Networks , 1997 .

[40]  Kazuhiro Ohkura,et al.  Modelling of Biological Manufacturing Systems for Dynamic Reconfiguration , 1997 .

[41]  Tayfur Altiok,et al.  Performance analysis of manufacturing systems , 1996 .

[42]  James S. Noble,et al.  The changing basis of performance measurement , 1996 .

[43]  Mark Graham Brown,et al.  Keeping Score: Using the Right Metrics to Drive World-Class Performance , 1996 .

[44]  Marek Szwejczewski,et al.  Manufacturing strategy and performance: A study of the UK engineering industry , 1996 .

[45]  R. Kaplan,et al.  The Balanced Scorecard: Translating Strategy into Action , 1996 .

[46]  George Chryssolouris,et al.  Flexibility and Its Measurement , 1996 .

[47]  Sanchoy K. Das,et al.  The measurement of flexibility in manufacturing systems , 1996 .

[48]  G Frizelle,et al.  Measuring complexity as an aid to developing operational strategy , 1995 .

[49]  Andy Neely,et al.  Performance measurement system design , 1995 .

[50]  Antony R Mileham,et al.  Manufacturing flexibility - A case for excess capacity , 1995 .

[51]  Paul T. Kidd,et al.  Agile Manufacturing: Forging New Frontiers , 1994 .

[52]  Garland Chow,et al.  Logistics Performance: Definition and Measurement , 1994 .

[53]  R. Boxwell Benchmarking for competitive advantage , 1994 .

[54]  H.-P. Wiendahl,et al.  Management and Control of Complexity in Manufacturing , 1994 .

[55]  D. Gerwin Manufacturing flexibility: a strategic perspective , 1993 .

[56]  Hans-Jürgen Warnecke,et al.  The Fractal Company , 1993 .

[57]  Hans-Peter Wiendahl,et al.  Logistics Performance Measurement of Shop Floor Activities , 1993 .

[58]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[59]  Kanji Ueda,et al.  A Concept for Bionic Manufacturing Systems Based on DNA-type Information , 1992, PROLAMAT.

[60]  Nagen Nagarur Some performance measures of flexible manufacturing systems , 1992 .

[61]  R. Johnston,et al.  Performance Measurement in Service Businesses , 1992 .

[62]  John L. Burbidge,et al.  Production flow analysis for planning group technology , 1991 .

[63]  R. Eccles The performance measurement manifesto. , 1991, Harvard business review.

[64]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[65]  Alfred J. Nanni,et al.  The New Performance Challenge: Measuring Operations for World-Class Competition , 1990 .

[66]  Yash P. Gupta,et al.  Flexibility of manufacturing systems: Concepts and measurements , 1989 .

[67]  Diwakar Gupta,et al.  A framework for understanding flexibility of manufacturing systems , 1989 .

[68]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[69]  I. Welber,et al.  Factory of the future , 1987, IEEE Control Systems Magazine.

[70]  Johnson Aimie Edosomwan,et al.  Integrating productivity and quality management , 1987 .

[71]  Shlomo Globerson,et al.  Issues in developing a performance criteria system for an organization , 1985 .

[72]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[73]  R. G. Norman,et al.  Productivity measurement and incentives , 1972 .

[74]  Ray Wild Mass-production management,: The design and operation of production flow-line systems , 1972 .

[75]  Herwart Opitz,et al.  A classification system to describe workpieces , 1970 .

[76]  S. P. Mitrofanov SCIENTIFIC PRINCIPLES OF GROUP TECHNOLOGY , 1961 .

[77]  Roy Anderson Foulke,et al.  Practical financial statement analysis , 1961 .