Prioritizing process improvement initiatives in manufacturing environments

In today's competitive and globalized markets, companies need to focus on eliminating wastes in their processes and implement continuous improvement initiatives. Lean and Six Sigma are two process improvement philosophies that have been successfully applied by many organizations to improve their business processes. Selecting and prioritizing process improvement initiatives in the workplace can be a challenging task, especially when multiple decision factors are involved. In this study, a proposed framework for prioritizing process improvement initiatives in manufacturing environments is developed which considers process variables, resource constraints, and operator skills. The framework ranks workplace areas and uses a multi-objective optimization model to assign improvement projects and associated operators. A case study from a manufacturing environment is used to illustrate the applicability of the proposed framework.

[1]  Sarah S. Lam,et al.  An integrated simulation–optimization study for consolidating production lines in a configure-to-order production environment , 2014 .

[2]  Don Tapping,et al.  Value Stream Management: Eight Steps to Planning, Mapping, and Sustaining Lean Improvements , 2002 .

[3]  Maria Crema,et al.  Identification and development of Lean and Safety projects , 2016 .

[4]  Taho Yang,et al.  Implementing lean standard work to solve a low work-in-process buffer problem in a highly automated manufacturing environment , 2015 .

[5]  Joseph C. Paradi,et al.  Information systems project prioritization using data envelopment analysis , 2005, Math. Comput. Model..

[6]  Huaguang Zhang,et al.  Chaotic Dynamics in Smart Grid and Suppression Scheme via Generalized Fuzzy Hyperbolic Model , 2014 .

[7]  Remon F. Aziz,et al.  Applying lean thinking in construction and performance improvement , 2013 .

[8]  Joachim Metternich,et al.  Evaluation of Work Measurement Concepts for a Cellular Manufacturing Reference Line to Enable Low Cost Automation for Lean Machining , 2014 .

[9]  Gwo-Hshiung Tzeng,et al.  Applying a Hybrid MCDM Model for Six Sigma Project Selection , 2014 .

[10]  Ana I. Pereira,et al.  Reconfigurable Standardized Work in a Lean Company – A Case Study☆ , 2016 .

[11]  Abdallah Kassem,et al.  Lean manufacturing: implementation and assessment in the Lebanese pharmaceutical industry , 2014 .

[12]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[13]  Vyacheslav V. Kalashnikov,et al.  Bi-objective project portfolio selection in Lean Six Sigma , 2017 .

[14]  Faisal Aqlan,et al.  Integrating lean principles and fuzzy bow-tie analysis for risk assessment in chemical industry , 2014 .

[15]  Daniel Markovitz A Factory of One: Applying Lean Principles to Banish Waste and Improve Your Personal Performance , 2011 .

[16]  Vukman Bakić,et al.  Prioritization of manufacturing sectors in Serbia for energy management improvement – AHP method , 2015 .

[17]  Taho Yang,et al.  Six-Sigma Project Selection Using National Quality Award Criteria and Fuzzy Multiple Criteria Decision-Making Method , 2008, 2008 4th International Conference on Wireless Communications, Networking and Mobile Computing.

[18]  Dimitris Mourtzis,et al.  Lean Rules Identification and Classification for Manufacturing Industry , 2016 .