Fuzzy distributed two-stage hybrid flow shop scheduling problem with setup time: collaborative variable search

[1]  Deming Lei,et al.  Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling , 2012, Appl. Soft Comput..

[2]  Feifeng Zheng,et al.  Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times , 2016 .

[3]  Deming Lei,et al.  A genetic algorithm for flexible job shop scheduling with fuzzy processing time , 2010 .

[4]  John W. Fowler,et al.  A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines , 2018, J. Sched..

[5]  Ling Wang,et al.  A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold , 2019, IEEE Transactions on Cybernetics.

[6]  Lothar Thiele,et al.  Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..

[7]  Rubén Ruiz,et al.  The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..

[8]  Ming Liu,et al.  Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method , 2014 .

[9]  Ling Wang,et al.  A competitive memetic algorithm for multi-objective distributed permutation flow shop scheduling problem , 2017, Swarm and Evolutionary Computation.

[10]  Ewa Figielska,et al.  A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages , 2014, Eur. J. Oper. Res..

[11]  Javad Behnamian,et al.  Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation , 2014, Comput. Oper. Res..

[12]  Shih-Wei Lin,et al.  Minimizing makespan for the distributed hybrid flowshop scheduling problem with multiprocessor tasks , 2018, Expert Syst. Appl..

[13]  Ming Liu,et al.  A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem , 2013, Comput. Oper. Res..

[14]  Jatinder N. D. Gupta,et al.  Two-Stage, Hybrid Flowshop Scheduling Problem , 1988 .

[15]  Ignacio E. Grossmann,et al.  A multiscale decomposition method for the optimal planning and scheduling of multi-site continuous multiproduct plants , 2011 .

[16]  Minghao Yin,et al.  A novel fuzzy model for multi-objective permutation flow shop scheduling problem with fuzzy processing time , 2019 .

[17]  Dong-Ho Lee,et al.  Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops , 2017, Int. J. Prod. Res..

[18]  Jaehwan Yang,et al.  Minimizing total completion time in two-stage hybrid flow shop with dedicated machines , 2011, Comput. Oper. Res..

[19]  Ming Liu,et al.  A heuristic method for two-stage hybrid flow shop with dedicated machines , 2013, Comput. Oper. Res..

[20]  Zaifang Zhang,et al.  Solving the two-stage hybrid flow shop scheduling problem based on mutant firefly algorithm , 2018, J. Ambient Intell. Humaniz. Comput..

[21]  Seyyed M. T. Fatemi Ghomi,et al.  Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan , 2011, Appl. Soft Comput..

[22]  Ling Wang,et al.  An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem , 2013 .

[23]  Shih-Wei Lin,et al.  Minimizing Makespan in Distributed Blocking Flowshops Using Hybrid Iterated Greedy Algorithms , 2017, IEEE Access.

[24]  John N. Hooker,et al.  A Hybrid Method for the Planning and Scheduling , 2005, Constraints.

[25]  Jian Lin,et al.  A backtracking search hyper-heuristic for the distributed assembly flow-shop scheduling problem , 2017, Swarm Evol. Comput..

[26]  Cengiz Kahraman,et al.  A New Artificial Immune System Algorithm for Multiobjective Fuzzy Flow Shop Problems , 2009 .

[27]  Keyi Xing,et al.  Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan , 2018 .

[28]  Deming Lei,et al.  Fuzzy job shop scheduling problem with availability constraints , 2010, Comput. Ind. Eng..

[29]  Abdelhakim Artiba,et al.  Scheduling two-stage hybrid flow shop with availability constraints , 2006, Comput. Oper. Res..

[30]  Deming Lei Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems , 2008 .

[31]  R. Shafaei,et al.  An intelligent hybrid meta-heuristic for solving a case of no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines , 2014 .

[32]  Reza Tavakkoli-Moghaddam,et al.  An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations , 2015, Int. J. Comput. Integr. Manuf..

[33]  G. M. Komaki,et al.  Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems , 2016 .

[34]  Shengyao Wang,et al.  A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem , 2016 .

[35]  Seyyed M. T. Fatemi Ghomi,et al.  The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine , 2013, Inf. Sci..

[36]  Shih-Wei Lin,et al.  Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm , 2013 .

[37]  Rubén Ruiz,et al.  A scatter search algorithm for the distributed permutation flowshop scheduling problem , 2014, Eur. J. Oper. Res..

[38]  T. Hodgson,et al.  Satisfying due-dates in large multi-factory supply chains , 2002 .

[39]  Deming Lei,et al.  Solving fuzzy job shop scheduling problems using random key genetic algorithm , 2010 .

[40]  Shih-Wei Lin,et al.  Minimizing makespan for solving the distributed no-wait flowshop scheduling problem , 2016, Comput. Ind. Eng..

[41]  Jatinder N. D. Gupta,et al.  A review of scheduling research involving setup considerations , 1999 .

[42]  Ching-Jong Liao,et al.  A case study in a two-stage hybrid flow shop with setup time and dedicated machines , 2003 .

[43]  Zhi-Long Chen,et al.  Order Assignment and Scheduling in a Supply Chain , 2006, Oper. Res..

[44]  Yu Du,et al.  Solving Distributed Hybrid Flowshop Scheduling Problems by a Hybrid Brain Storm Optimization Algorithm , 2019, IEEE Access.