Cyclic job scheduling in paced assembly lines with cross-trained workers
暂无分享,去创建一个
[1] K. E. Stecke,et al. Procedures to determine part mix ratios for independent demands in flexible manufacturing systems , 1992 .
[2] Kenjiro Okamura,et al. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor , 1979 .
[3] J. J. Bartholdi,et al. Balancing two-sided assembly lines: a case study , 1993 .
[4] Nick T. Thomopoulos,et al. Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .
[5] Joseph B. Mazzola,et al. Flow Shop Scheduling with Resource Flexibility , 1994, Oper. Res..
[6] Chung Yee Lee,et al. Cross-Training Effectiveness and Profitability , 1994 .
[7] George L. Vairaktarakis,et al. Complexity of Workforce Scheduling in Transfer Lines , 2003, J. Glob. Optim..
[8] Ezey M. Dar-El,et al. Assembly line sequencing for model mix , 1975 .
[9] Selcuk Karabati,et al. Cyclic scheduling in synchronous production lines , 1999 .
[10] Donald D. Eisenstein,et al. A Production Line that Balances Itself , 1996, Oper. Res..
[11] Joseph B. Mazzola,et al. An analysis of heuristics for the parallel-machine flexible-resource scheduling problem , 1997, Ann. Oper. Res..
[12] Michael Pinedo,et al. Sequencing in an Assembly Line with Blocking to Minimize Cycle Time , 1989, Oper. Res..
[13] George L. Vairaktarakis,et al. Workforce planning in synchronous production systems , 2002, Eur. J. Oper. Res..
[14] Brian W. Kernighan,et al. An Effective Heuristic Algorithm for the Traveling-Salesman Problem , 1973, Oper. Res..
[15] George L. Vairaktarakis,et al. Workforce Planning in Mixed Model Assembly Systems , 1997, Oper. Res..