A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks
暂无分享,去创建一个
[1] P. Marcotte,et al. A bilevel model of taxation and its application to optimal highway pricing , 1996 .
[2] Belén Melián-Batista,et al. A Study of Rescheduling Strategies for the Quay Crane Scheduling Problem under Random Disruptions , 2014, Inteligencia Artif..
[3] Lu Zhen,et al. A bi-objective model for robust berth allocation scheduling , 2012, Comput. Ind. Eng..
[4] Pablo A. Parrilo,et al. Partial facial reduction: simplified, equivalent SDPs via approximations of the PSD cone , 2014, Math. Program..
[5] Chuqian Zhang,et al. A heuristic for dynamic yard crane deployment in a container terminal , 2003 .
[6] Jinjiang Yuan,et al. Rescheduling with release dates to minimize makespan under a limit on the maximum sequence disruption , 2007, Eur. J. Oper. Res..
[7] Li-feng Xi,et al. A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time , 2010, Eur. J. Oper. Res..
[8] Andrew Lim,et al. A m‐parallel crane scheduling problem with a non‐crossing constraint , 2007 .
[9] Shell-Ying Huang,et al. Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals , 2012, Transp. Sci..
[10] Ya Li,et al. Yard crane deployment in container terminals , 2014, Proceedings of the Winter Simulation Conference 2014.
[11] Gilbert Laporte,et al. Scheduling Twin Yard Cranes in a Container Block , 2015, Transp. Sci..
[12] Chung-Lun Li,et al. Interblock Crane Deployment in Container Terminals , 2002, Transp. Sci..
[13] Qiang Meng,et al. Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm , 2007 .
[14] Farouk Yalaoui,et al. Crane scheduling problem with non-interference constraints in a steel coil distribution centre , 2017 .
[15] Gülay Barbarosoglu,et al. A two-stage stochastic programming framework for transportation planning in disaster response , 2004, J. Oper. Res. Soc..
[16] Amir Hossein Gharehgozli,et al. A simulation study of the performance of twin automated stacking cranes at a seaport container terminal , 2017, Eur. J. Oper. Res..
[17] Vishal Gupta,et al. Robust sample average approximation , 2014, Math. Program..
[18] Nils Boysen,et al. On the quality of simple measures predicting block relocations in container yards , 2018 .
[19] Nhu Binh Ho,et al. An effective architecture for learning and evolving flexible job-shop schedules , 2007, Eur. J. Oper. Res..
[20] Dominique Feillet,et al. SAPI: Statistical Analysis of Propagation of Incidents. A new approach for rescheduling trains after disruptions , 2011, Eur. J. Oper. Res..
[21] Wen-Jing Hsu,et al. Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information , 2011, Adv. Eng. Informatics.
[22] Nils Boysen,et al. Gantry crane scheduling in intermodal rail-road container terminals , 2018, Int. J. Prod. Res..
[23] Jaap A. Ottjes,et al. Simulation-based rescheduling of the stacker-reclaimer operation , 2015, J. Comput. Sci..
[24] Zalmiyah Zakaria,et al. Genetic algorithms for match-up rescheduling of the flexible manufacturing systems , 2012, Comput. Ind. Eng..
[25] Changzheng Liu,et al. A two-stage stochastic programming model for transportation network protection , 2009, Comput. Oper. Res..
[26] Leo G. Kroon,et al. Maintenance Appointments in Railway Rolling Stock Rescheduling , 2016, Transp. Sci..
[27] Shell-Ying Huang,et al. Embedding simulation in yard crane dispatching to minimize job tardiness in container terminals , 2012, Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC).
[28] Zehui Mao,et al. Incipient Fault Detection for Traction Motors of High-Speed Railways Using an Interval Sliding Mode Observer , 2019, IEEE Transactions on Intelligent Transportation Systems.
[29] Comparison of metaheuristic algorithms for Examination Timetabling Problem , 2004 .
[30] G H Huang,et al. An inexact mixed risk-aversion two-stage stochastic programming model for water resources management under uncertainty , 2014, Environmental Science and Pollution Research.
[31] George B. Dantzig,et al. Linear Programming Under Uncertainty , 2004, Manag. Sci..
[32] Mitsuo Gen,et al. A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems , 2008, Comput. Oper. Res..
[33] Loo Hay Lee,et al. A decision model for berth allocation under uncertainty , 2011, Eur. J. Oper. Res..
[34] Jan Tijmen Udding,et al. A decision-tree stacking heuristic minimising the expected number of reshuffles at a container terminal , 2014 .
[35] Mark Goh,et al. Discrete time model and algorithms for container yard crane scheduling , 2009, Eur. J. Oper. Res..
[36] Alexander Shapiro,et al. The Sample Average Approximation Method Applied to Stochastic Routing Problems: A Computational Study , 2003, Comput. Optim. Appl..
[37] Chung Yee Lee,et al. Bi-objective optimization for the container terminal integrated planning , 2016 .
[38] Amie R. Albrecht,et al. Rescheduling rail networks with maintenance disruptions using Problem Space Search , 2013, Comput. Oper. Res..
[39] Tao Zhang,et al. Scheduling optimization of yard cranes with minimal energy consumption at container terminals , 2017, Comput. Ind. Eng..
[40] Alexander Shapiro,et al. Sample Average Approximation Method for Chance Constrained Programming: Theory and Applications , 2009, J. Optimization Theory and Applications.
[41] K. L. Mak,et al. Yard crane scheduling in port container terminals , 2005 .
[42] Iris F. A. Vis,et al. Transshipment of containers at a container terminal: An overview , 2003, Eur. J. Oper. Res..
[43] J.-C. Billaut,et al. A Genetic Algorithm For A Bicriteria Flexible Job Shop Scheduling Problem , 2006, 2006 International Conference on Service Systems and Service Management.
[44] Uwe Aickelin,et al. An Indirect Genetic Algorithm for a Nurse Scheduling Problem , 2004, Comput. Oper. Res..
[45] Wei Wang,et al. Sample average approximation of expected value constrained stochastic programs , 2008, Oper. Res. Lett..
[46] Mark Goh,et al. Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement , 2015, Transp. Sci..
[47] Richard J. Linn,et al. Rubber tired gantry crane deployment for container yard operation , 2003, Comput. Ind. Eng..
[48] Guohe Huang,et al. AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY , 2000 .
[49] Guohe Huang,et al. Inexact two-stage stochastic robust optimization model for water resources management under uncertainty. , 2009 .
[50] Kap Hwan Kim,et al. A heuristic rule for relocating blocks , 2006, Comput. Oper. Res..
[51] George Chryssolouris,et al. Dynamic scheduling of manufacturing job shops using genetic algorithms , 2001, J. Intell. Manuf..
[52] H. J. Warnecke,et al. Flexible manufacturing systems , 1985 .
[53] Richard J. Linn,et al. Dynamic crane deployment in container storage yards , 2002 .
[54] Wu Zhiming,et al. The application of Adaptive Genetic Algorithms in FMS dynamic rescheduling , 2003, Int. J. Comput. Integr. Manuf..
[55] Alexander Shapiro,et al. The Sample Average Approximation Method for Stochastic Discrete Optimization , 2002, SIAM J. Optim..
[56] Kairon Freitas Guimaraes,et al. An Approach for Flexible Job-Shop Scheduling with Separable Sequence-Dependent Setup Time , 2006, 2006 IEEE International Conference on Systems, Man and Cybernetics.
[57] Iris F. A. Vis,et al. Sequencing Two Cooperating Automated Stacking Cranes in a Container Terminal , 2010, Transp. Sci..
[58] Kap Hwan Kim,et al. An Optimal Routing Algorithm for a Transfer Crane in Port Container Terminals , 1999, Transp. Sci..
[59] K. L. Mak,et al. An effective heuristic for scheduling a yard crane to handle jobs with different ready times , 2005 .
[60] Feng Chu,et al. Two Yard Crane Scheduling With Dynamic Processing Time and Interference , 2018, IEEE Transactions on Intelligent Transportation Systems.
[61] Changchun Liu,et al. Behavior perception-based disruption models for berth allocation and quay crane assignment problems , 2016, Comput. Ind. Eng..
[62] Shuo Wang,et al. A multi-level Taguchi-factorial two-stage stochastic programming approach for characterization of parameter uncertainties and their interactions: An application to water resources management , 2015, Eur. J. Oper. Res..
[63] Ya Li,et al. Yard crane dispatching to minimize vessel turnaround times in container terminals , 2014, Proceedings of the Winter Simulation Conference 2014.
[64] Zhiming Wu,et al. A Genetic Algorithm Approach to the Scheduling of FMSs with Multiple Routes , 2001 .
[65] Han Hoogeveen,et al. Rescheduling for new orders on a single machine with setup times , 2012, Eur. J. Oper. Res..
[66] S. G. Deshmukh,et al. FMS scheduling with knowledge based genetic algorithm approach , 2011, Expert Syst. Appl..
[67] W. C. Ng,et al. Crane scheduling in container yards with inter-crane interference , 2005, Eur. J. Oper. Res..
[68] Jens Clausen,et al. Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic , 2010 .
[69] Xiaohan Wang,et al. A MCVRP-based model for PCB assembly optimisation on the beam-type placement machine , 2019 .
[70] Patrice Marcotte,et al. Two-stage stochastic bilevel programming over a transportation network , 2013 .