Calibration and validation of a modified ASM1 using long‐term simulation of a full‐scale pulp mill wastewater treatment plant

A mathematical model modified from the well established Activated Sludge Model no. 1 was used for modelling a full‐scale wastewater treatment plant (WWTP) in a bleached kraft pulp mill. Effluents from the pulp and paper industry are typically nutrient deficient, which was considered in the model. The wastewater characterization and model calibration were based on respirometric batch experiments with sludge and wastewater sampled from the WWTP. The model performance was validated in a long‐term simulation using routinely measured process data from the WWTP as the model inputs. The simulation results proved useful in evaluating nutrient dosage strategies at the WWTP and in troubleshooting poor treatment plant performance. However, in order to achieve a completely accurate description of nitrogen removal, more complex phenomena would have to be included in the model. Even though the simulated period was long compared to the brief measurement campaign used in the model calibration, the model was able to describe the treatment plant’s behaviour. The calibrated model can be expected to stay valid for a long time, which allows the use of deterministic modelling in practical applications at pulp and paper WWTPs.

[1]  P A Barañao,et al.  Modelling carbon oxidation in pulp mill activated sludge systems: calibration of Activated Sludge Model No 3. , 2004, Water science and technology : a journal of the International Association on Water Pollution Research.

[2]  Peter A Vanrolleghem,et al.  Parallel hybrid modeling methods for a full-scale cokes wastewater treatment plant. , 2005, Journal of biotechnology.

[3]  W. Gujer,et al.  Activated sludge model No. 3 , 1995 .

[4]  Peter Krebs,et al.  Potential of denitrification and solids removal in the rectangular clarifier , 1999 .

[5]  Krist V. Gernaey,et al.  Activated sludge wastewater treatment plant modelling and simulation: state of the art , 2004, Environ. Model. Softw..

[6]  T. Clark,et al.  Nitrogen fixation in an aerated stabilization basin treating bleached kraft mill wastewater , 1997 .

[7]  Marinette HagMan,et al.  Oxygen uptake rate measurements fOr applicatiOn at wastewater treatment plants , 2007 .

[8]  Krist V. Gernaey,et al.  Evaluation of an ASM1 model calibration procedure on a municipal-industrial wastewater treatment plant , 2002 .

[9]  Kun Soo Chang,et al.  Hybrid neural network modeling of a full-scale industrial wastewater treatment process. , 2002, Biotechnology and bioengineering.

[10]  H. D. Stensel,et al.  Wastewater Engineering: Treatment and Reuse , 2002 .

[11]  G. Lloyd-Jones,et al.  Composition of nifH in a wastewater treatment system reliant on N2 fixation , 2008, Applied Microbiology and Biotechnology.

[12]  Sylvie Gillot,et al.  The COST Simulation Benchmark: Description and Simulator Manual , 2001 .

[13]  J. Jansen Oxygen uptake rate measurements fOr applicatiOn at wastewater treatment plants , 2007 .

[14]  D. Eikelboom Process Control of Activated Sludge Plants by Microscopic Investigation , 2000 .

[15]  Wim Moerman,et al.  Full-scale modelling of a food industry wastewater treatment plant in view of process upgrade , 2008 .

[16]  Krist V. Gernaey,et al.  Calibration of Activated Sludge Models: A Critical Review of Experimental Designs , 2003 .

[17]  Bulent Keskinler,et al.  Mathematical modelling of the activated sludge process: the Erzincan case , 2005 .

[18]  Peter A. Vanrolleghem,et al.  Modelling and optimisation of a chemical industry wastewater treatment plant subjected to varying production schedules , 2004 .

[19]  M. Doble,et al.  Biotreatment Of Industrial Effluents , 2005 .