[Session B1 생산일정/수리계획]대체기계와 공정순서를 고려한 Jop Shop에서의 통합 일정계획

In case that any jobs in a Job Shop can be scheduled on more than one machine and may have flexible operation sequences, with considering such case it is very difficult and complex to make the optimal process plans and scheduling. But they should be considered for an integrated model to perform more effective process planning and scheduling in this job shop problem. In this paper, we propose GA-based scheduling method to integrate effectively the problem of alternative machines, alternative operation sequences and scheduling. The performance of proposed GA is evaluated through comparing integrated scheduling with not integrated scheduling in molding company with alternative machines and operation sequences. Also, we use benchmark problems to evaluate performance. The scheduling method in this research will apply usefully to real world scheduling problems.