Structural evaluation of W-211 flexible receiver platforms and tank pit walls

This document is a structural analysis of the Flexible Receiver Platforms and the tank-pit wall during removal of equipment and during a accidental drop of that equipment. The platform and the pit walls must withstand a accidental drop of a mixer and transfer pumps in specific pits in tanks 102-AP and 104-AP. A mixer pump will be removed from riser 11 in pit 2A on tank 241-AP-102. A transfer pump will be removed from riser 13 in pit 2D on tank 241-AP-102 and another transfer pump will be removed from riser 3A in pit 4A on tank 241-AP-104.