Jointly Production and Correlated Maintenance Optimization for Parallel Leased Machines

This paper deals with a preventive maintenance strategy optimization correlated to production for a manufacturing system made by several parallel machines under lease contract. In order to minimize the total cost of production and maintenance by reducing the production system interruptions due to maintenance activities, a correlated group preventive maintenance policy is developed using the gravity center approach (GCA). The aim of this study is to determine an economical production plan and an optimal group preventive maintenance interval Tn at which all machines are maintained simultaneously. An analytical correlation between failure rate of machines and production level is considered and the impact of the preventive maintenance policy on the production plan is studied. Finally, the proposed maintenance policy GPM is compared with an individual simple strategy approach IPM in order to illustrate its efficiency.

[1]  S. Sheu,et al.  A generalized group maintenance policy , 1997 .

[2]  Yingjie Zhang,et al.  Dynamic decision-making for reliability and maintenance analysis of manufacturing systems based on failure effects , 2017, Enterp. Inf. Syst..

[3]  Paolo Renna,et al.  Influence of maintenance policies on multi-stage manufacturing systems in dynamic conditions , 2012 .

[4]  Hans Wortmann,et al.  Condition based maintenance in the context of opportunistic maintenance , 2012 .

[5]  Yu Zheng,et al.  Integrating production planning and maintenance: an iterative method , 2014, Ind. Manag. Data Syst..

[6]  Zhiqiang Lu,et al.  Integrated production scheduling and maintenance policy for robustness in a single machine , 2014, Comput. Oper. Res..

[7]  Chen Zi-xia,et al.  Study and application of Center-of-Gravity on the location selection of distribution center , 2010, 2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM).

[8]  Faicel Hnaien,et al.  A mixed-integer programming model for integrated production and maintenance , 2016 .

[9]  Nidhal Rezg,et al.  Joint optimization of preventive maintenance and inventory control in a production line using simulation , 2004 .

[10]  Xiaolan Xie,et al.  Maintenance préventive et optimisation des flux d'un système de production , 2002 .

[11]  Xiaohui Chen,et al.  Joint optimization of production scheduling and machine group preventive maintenance , 2016, Reliab. Eng. Syst. Saf..

[12]  Lin Ma,et al.  Group Maintenance Scheduling: A Case Study for a Pipeline Network , 2014 .

[13]  Farouk Yalaoui,et al.  Integrated production planning and preventive maintenance in deteriorating production systems , 2014, Inf. Sci..

[14]  Nidhal Rezg,et al.  Effects of extension of subcontracting on a production system in a joint maintenance and production context , 2010, Comput. Ind. Eng..

[15]  O. S. Silva Fo,et al.  Optimal feedback control scheme helping managers to adjust aggregate industrial resources , 1997 .

[16]  C. Watson-Gandy A Note on the Centre of Gravity in Depot Location , 1972 .

[17]  G. Laporte,et al.  An exact algorithm for minimizing routing and operating costs in depot location , 1981 .

[18]  Hajej Zied,et al.  A production planning optimization for multi parallel machine under withdrawal right , 2015, 2015 International Conference on Industrial Engineering and Operations Management (IEOM).

[19]  Anis Chelbi,et al.  Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance , 2004, Eur. J. Oper. Res..

[20]  E. A. Elsayed,et al.  An optimum group maintenance policy , 1983 .

[21]  T. C. Edwin Cheng,et al.  Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities , 2012, Comput. Oper. Res..

[22]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[23]  Nidhal Rezg,et al.  Preventive maintenance of manufacturing systems under environmental constraints , 2007 .

[24]  Phuc Do,et al.  Maintenance grouping for multi-component systems with availability constraints and limited maintenance teams , 2015, Reliab. Eng. Syst. Saf..

[25]  O. S. S. Filho Linear quadratic Gaussian problem with constraints applied to aggregated production planning , 2001, ACC.

[26]  Maxim Finkelstein,et al.  An optimal age-based group maintenance policy for multi-unit degrading systems , 2015, Reliab. Eng. Syst. Saf..

[27]  Michel Gendreau,et al.  Joint production-maintenance planning in an imperfect system with quality degradation , 2015, 2015 International Conference on Industrial Engineering and Systems Management (IESM).