Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal Process
暂无分享,去创建一个
Brian Wolshon | Dane Ismart | Chris Huffman | Vinay Dixit | Deborah Matherly | Yi-Chang Chiu | Hong Zheng | Essam Radwan | Lawrence Pesesky | William Sampson | Eric Nava | Eric Perry | Juan Morales | Ed Bromage | Lindsay Bromage | D. Matherly | Dane Ismart | V. Dixit | B. Wolshon | Y. Chiu | E. Radwan | Hong Zheng | L. Pesesky | E. Perry | E. Nava | C. Huffman | W. Sampson | Juan Morales | E. Bromage | Lindsay Bromage
[1] Mohammed Hadi,et al. Evaluation tools to support ITS planning process : development of a sketch planning tool in FSUTMS/cube environment. , 2008 .
[2] Keith R. Molenaar,et al. Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction , 2006 .
[3] R. Srinivasan,et al. Traffic Safety Evaluation of Nighttime and Daytime Work Zones , 2008 .
[4] Yimin Zhu,et al. Developing a Realistic-Prototyping RUC Evaluation Tool for FDOT , 2008 .
[5] J. Y. Yen. An algorithm for finding shortest routes from all source nodes to a given destination in general networks , 1970 .
[6] Gerald L Ullman,et al. Monitoring work zone safety and mobility impacts in Texas. , 2009 .
[7] Linda Novick,et al. San Diego I-15 Integrated Corridor Management (ICM) System: Phase I , 2008 .
[8] Michael D Meyer,et al. Transportation Performance Measures in Australia, Canada, Japan, and New Zealand , 2004 .
[9] Thomas H Maze,et al. Synthesis of Practices for Mitigating the Impact of Work Zones on Traffic , 2007 .
[10] Dimitrios Himonas,et al. Report from Finland , 2008 .
[11] Robert E. Tarjan,et al. A quick method for finding shortest pairs of disjoint paths , 1984, Networks.
[12] Gerald L Ullman,et al. Implementation Guide for Monitoring Work Zone Safety and Mobility Impacts , 2009 .
[13] J. W. Suurballe. Disjoint paths in a network , 1974, Networks.
[14] Khaled Nassar,et al. Simulation of asphalt paving operations under lane closure conditions , 2003 .
[15] Gerardo W Flintsch,et al. Performance-Based Network-Level Optimization for Pavement Management in Public-Private Partnerships , 2008 .
[16] Gerald L Ullman,et al. TRAFFIC MANAGEMENT AND ENFORCEMENT TOOLS TO IMPROVE WORK ZONE SAFETY , 2002 .
[17] Indrajit Chatterjee,et al. Replication of Work Zone Capacity Values in a Simulation Model , 2009 .
[18] James E Bryden,et al. Work Zone Impacts Assessment - An Approach to Assess and Manage Work Zone Safety and Mobility Impacts of Road Projects , 2006 .
[19] Yu-Yuan Chang,et al. A Tabu Search Based Approach for Work Zone Scheduling , 2000 .
[20] David Holtz,et al. Project Development Process , 2003 .
[21] Thomas H Maze,et al. Lane Closure Policy Development, Enforcement, and Exceptions: A Survey of Seven State Transportation Agencies , 2007 .
[22] Gang-Len Chang,et al. Simulation-Based Study on a Lane-Based Signal System for Merge Control at Freeway Work Zones , 2009 .
[23] Ahmed Al-Kaisy,et al. Evaluation of the effectiveness of single-lane two-way traffic control at maintenance and reconstruction zones , 2006 .
[24] Zongzhi Li,et al. Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study , 2009 .
[25] Waheed Uddin,et al. MAINTENANCE PLANNING METHODOLOGY FOR STATEWIDE PAVEMENT MANAGEMENT , 1994 .
[26] Thomas H Maze,et al. Synthesis of Traffic Calming Techniques in Work Zones , 2009 .
[27] Craig A Franklin,et al. Requirements, Choices, and Issues in Work Zone Monitoring , 2009 .
[28] Rami Harb,et al. Safety And Operational Evaluation Of Dynamic Lane Merging In Work Zones , 2009 .
[29] Keith R. Molenaar,et al. Construction Management Practices in Canada and Europe , 2005 .
[30] Matthew R. Horrocks,et al. A multi-year pavement maintenance program using a stochastic simulation-based genetic algorithm approach , 2006 .
[31] Eul-Bum Lee,et al. Knowledge-based scheduling analysis software for highway rehabilitation and reconstruction projects , 2005 .
[32] C M Dewald,et al. USE OF HIGHWAY NETWORK LEVEL DATA FOR A PROJECT LIFE CYCLE ANALYSIS , 1998 .
[33] Fang Clara Fang. Portable Intelligent Traffic Management System for Work Zones and Incident Management Systems: Best Practice Review , 2008, 2008 11th International IEEE Conference on Intelligent Transportation Systems.
[34] George Morcous,et al. Maintenance optimization of infrastructure networks using genetic algorithms , 2005 .
[35] Thomas H Maze,et al. Synthesis of Procedures to Forecast and Monitor Work Zone Safety and Mobility Impacts , 2005 .
[36] Richard J. Porter,et al. Modeling speed behavior of passenger cars and trucks in freeway construction work zones: Implications on work zone design and traffic control decision processes , 2008 .
[37] E. Martins,et al. A computational improvement for a shortest paths ranking algorithm , 1994 .
[38] S. Thomas Ng,et al. Optimizing Construction Time and Cost Using Ant Colony Optimization Approach , 2008 .
[39] Tomoya Shibayama,et al. OF PAVEMENT NETWORK MAINTENANCE AND REHABILITATION PLANNING USING SHUFFLED COMPLEX EVOLUTION , 2007 .
[40] Thomas Schnell,et al. Evaluation of Traffic Flow Analysis Tools Applied to Work Zones Based on Flow Data Collected in the Field , 2002 .
[41] Steven D Schrock,et al. IMPROVING TRAFFIC CONTROL EFFECTIVENESS IN COMPLEX WORK ZONES , 2003 .
[42] Stuart D. Anderson,et al. Process for Selecting Strategies for Rehabilitation of Rigid Pavements Under High Traffic Volumes , 2003 .
[43] Xin Chen,et al. URMS. A graphical urban roadway management system at network level , 1993 .
[44] Hsin-Yun Lee. Optimizing schedule for improving the traffic impact of work zone on roads , 2009 .
[45] Wei-Bin Zhang. Study of Integrated Corridor Management for San Francisco Bay Area I-880 Area Corridor , 2008 .
[46] Asif Faiz,et al. Areawide Performance-Based Rehabilitation and Maintenance Contracts for Low-Volume Roads , 1999 .
[47] Yafeng Yin,et al. Impact of Lane Closures on Roadway Capacity. Part C: Modeling Diversion Propensity at Work Zones , 2008 .
[48] Yingfeng Li,et al. Effectiveness of Temporary Traffic Control Measures in Highway Work Zones , 2007 .
[49] Mike Bishop,et al. INTEGRATED ASSET MANAGEMENT GUIDELINES FOR ROAD NETWORKS , 2002 .
[50] Mark A. Turnquist,et al. Optimization Modeling for Enhanced Network-Level Pavement Management System , 1996 .
[51] Jon Bottom,et al. Dynamic Traffic Assignment: A Primer , 2011 .
[52] Anthony P Voigt,et al. Accelerating Major Freeway Reconstruction Projects: The Houston Experience , 1998 .
[53] Fred L. Mannering,et al. Weekend Closure for Construction of Asphalt Overlay on Urban Highway , 2000 .
[54] Lisa K. Spainhour,et al. ANALYSIS OF WORK ZONE MOT DATA COLLECTION AND USAGE PROCEDURES , 2002 .
[55] Jian John Lu,et al. Integrated Work Zone Safety Management System and Analysis Tools , 2008 .
[56] Yimin Zhu,et al. Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects , 2009 .
[57] Gerald L Ullman,et al. Final Report for NCHRP Report 581: Design of Construction Work Zones on High-Speed Highways , 2006 .
[58] Catharina Sikow,et al. IMPACT ANALYSIS OF ROAD KEEPING: CASE STUDY OF LAPLAND DISTRICT IN FINLAND , 1994 .
[59] Conrad L Dudek,et al. Sequential Warning-Light System for Work-Zone Lane Closures , 2001 .
[60] Pothu Raju Khanta. Evaluation of Traffic Simulation Models for Work Zones in the New England Area , 2008 .
[61] Laszlo Gaspar. COMPILATION OF FIRST HUNGARIAN NETWORK-LEVEL PAVEMENT MANAGEMENT SYSTEM , 1994 .
[62] Samuel Labi,et al. Identifying the Appropriate Contract Types for Highway Maintenance and Rehabilitation Projects on the Basis of Project Characteristics , 2009 .
[63] Zongzhi Li,et al. Highway Work Zone Safety Audits at the Construction Stage , 2009 .
[64] Steven D Schrock,et al. Examination of Effectiveness of Early Merge Work-Zone Signing , 2009 .
[65] Eul-Bum Lee,et al. Planning urban highway reconstruction with traffic demand affected by construction schedule , 2005 .
[66] Peter T. Savolainen,et al. Evaluation of Motorist Awareness System , 2009 .
[67] Der-Horng Lee,et al. SCHEDULING OF LANE CLOSURES USING GENETIC ALGORITHMS WITH TRAFFIC ASSIGNMENTS AND DISTRIBUTED SIMULATIONS , 2004 .
[68] Adeel Z Lari,et al. Advanced Acquisition of Right-of-Way: Best Practices and Corridor Case Studies , 2009 .
[69] Rahim F Benekohal,et al. Comparative Analysis Report: The Benefits of Using Intelligent Transportation Systems in Work Zones , 2008 .
[70] Lily Elefteriadou,et al. Impact of Lane Closures on Roadway Capacity. Part B: Arterial Work Zone Capacity , 2008 .
[71] Eul-Bum Lee,et al. Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks , 2008 .
[72] E. Queirós Vieira Martins. An algorithm for ranking paths in acyclic networks , 1983 .
[73] Will Davis,et al. QuickZone Improvement for Rural Freeway and Model Validation , 2009 .
[74] Chandra Bahadur Shrestha. DEVELOPING A COMPUTER-AIDED METHODOLOGY FOR DISTRICT ROAD NETWORK PLANNING AND PRIORITIZATION IN NEPAL , 2003 .
[75] Michelle L. Povinelli. Variable speed limit , 2006 .
[76] Mehmet Emre Bayraktar,et al. A decision support system for selecting the optimal contracting strategy in highway work zone projects , 2009 .
[77] Eul-Bum Lee,et al. Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors , 2000 .
[78] James E Bryden,et al. A PROCEDURE FOR ASSESSING AND PLANNING NIGHTTIME HIGHWAY CONSTRUCTION AND MAINTENANCE , 2002 .
[79] Klong Luang,et al. NETWORK-LEVEL MAINTENANCE PLANNING USING PAVEMENT VALUATION , 2003 .
[80] P Pakkala. Innovative project delivery methods for infrastructure: an international perspective , 2002 .
[81] Thomas W. Hartmann,et al. Revised Process for Work Zone Decision Making Based on Quantitative Performance Measures , 2009 .
[82] Caroline B. Cooney. Hit the Road , 2006 .
[83] Kamal Golabi,et al. INNOVATIVE PAVEMENT MANAGEMENT AND PLANNING SYSTEM FOR ROAD NETWORK OF PORTUGAL , 2003 .
[84] William Outcalt. Work Zone Speed Control , 2009 .
[85] J. A. Obrien. Management Information System , 2004 .