Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal Process

This report documents and presents the results of a study to develop a software tool capable of evaluating the strategic impact at the regional or large corridor level of constructing renewal projects and programs. Existing work zone related software and evaluation tools were reviewed and the best aspects were incorporated in the development of the WISE (Work zone Impact and Strategy Estimator) Tool. WISE has the capability to evaluate the regional impact of various strategies such as day/night operations, innovative contracting, fast construction techniques, advanced maintenance of traffic plans and public information programs. WISE evaluates the renewal projects at both the planning and the operation level. When used as a planning tool WISE develops an optimized renewal programming schedule that minimizes delays to the public and agency cost. When used at the operational level it evaluates the impact of individual strategies at the project level; the results can then be used as part of an iterative procedure with the planning analysis. The WISE tool does not require the use of proprietary software and builds on the existing travel demand software used by State agencies and metropolitan planning organizations (MPOs).

[1]  Mohammed Hadi,et al.  Evaluation tools to support ITS planning process : development of a sketch planning tool in FSUTMS/cube environment. , 2008 .

[2]  Keith R. Molenaar,et al.  Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction , 2006 .

[3]  R. Srinivasan,et al.  Traffic Safety Evaluation of Nighttime and Daytime Work Zones , 2008 .

[4]  Yimin Zhu,et al.  Developing a Realistic-Prototyping RUC Evaluation Tool for FDOT , 2008 .

[5]  J. Y. Yen An algorithm for finding shortest routes from all source nodes to a given destination in general networks , 1970 .

[6]  Gerald L Ullman,et al.  Monitoring work zone safety and mobility impacts in Texas. , 2009 .

[7]  Linda Novick,et al.  San Diego I-15 Integrated Corridor Management (ICM) System: Phase I , 2008 .

[8]  Michael D Meyer,et al.  Transportation Performance Measures in Australia, Canada, Japan, and New Zealand , 2004 .

[9]  Thomas H Maze,et al.  Synthesis of Practices for Mitigating the Impact of Work Zones on Traffic , 2007 .

[10]  Dimitrios Himonas,et al.  Report from Finland , 2008 .

[11]  Robert E. Tarjan,et al.  A quick method for finding shortest pairs of disjoint paths , 1984, Networks.

[12]  Gerald L Ullman,et al.  Implementation Guide for Monitoring Work Zone Safety and Mobility Impacts , 2009 .

[13]  J. W. Suurballe Disjoint paths in a network , 1974, Networks.

[14]  Khaled Nassar,et al.  Simulation of asphalt paving operations under lane closure conditions , 2003 .

[15]  Gerardo W Flintsch,et al.  Performance-Based Network-Level Optimization for Pavement Management in Public-Private Partnerships , 2008 .

[16]  Gerald L Ullman,et al.  TRAFFIC MANAGEMENT AND ENFORCEMENT TOOLS TO IMPROVE WORK ZONE SAFETY , 2002 .

[17]  Indrajit Chatterjee,et al.  Replication of Work Zone Capacity Values in a Simulation Model , 2009 .

[18]  James E Bryden,et al.  Work Zone Impacts Assessment - An Approach to Assess and Manage Work Zone Safety and Mobility Impacts of Road Projects , 2006 .

[19]  Yu-Yuan Chang,et al.  A Tabu Search Based Approach for Work Zone Scheduling , 2000 .

[20]  David Holtz,et al.  Project Development Process , 2003 .

[21]  Thomas H Maze,et al.  Lane Closure Policy Development, Enforcement, and Exceptions: A Survey of Seven State Transportation Agencies , 2007 .

[22]  Gang-Len Chang,et al.  Simulation-Based Study on a Lane-Based Signal System for Merge Control at Freeway Work Zones , 2009 .

[23]  Ahmed Al-Kaisy,et al.  Evaluation of the effectiveness of single-lane two-way traffic control at maintenance and reconstruction zones , 2006 .

[24]  Zongzhi Li,et al.  Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study , 2009 .

[25]  Waheed Uddin,et al.  MAINTENANCE PLANNING METHODOLOGY FOR STATEWIDE PAVEMENT MANAGEMENT , 1994 .

[26]  Thomas H Maze,et al.  Synthesis of Traffic Calming Techniques in Work Zones , 2009 .

[27]  Craig A Franklin,et al.  Requirements, Choices, and Issues in Work Zone Monitoring , 2009 .

[28]  Rami Harb,et al.  Safety And Operational Evaluation Of Dynamic Lane Merging In Work Zones , 2009 .

[29]  Keith R. Molenaar,et al.  Construction Management Practices in Canada and Europe , 2005 .

[30]  Matthew R. Horrocks,et al.  A multi-year pavement maintenance program using a stochastic simulation-based genetic algorithm approach , 2006 .

[31]  Eul-Bum Lee,et al.  Knowledge-based scheduling analysis software for highway rehabilitation and reconstruction projects , 2005 .

[32]  C M Dewald,et al.  USE OF HIGHWAY NETWORK LEVEL DATA FOR A PROJECT LIFE CYCLE ANALYSIS , 1998 .

[33]  Fang Clara Fang Portable Intelligent Traffic Management System for Work Zones and Incident Management Systems: Best Practice Review , 2008, 2008 11th International IEEE Conference on Intelligent Transportation Systems.

[34]  George Morcous,et al.  Maintenance optimization of infrastructure networks using genetic algorithms , 2005 .

[35]  Thomas H Maze,et al.  Synthesis of Procedures to Forecast and Monitor Work Zone Safety and Mobility Impacts , 2005 .

[36]  Richard J. Porter,et al.  Modeling speed behavior of passenger cars and trucks in freeway construction work zones: Implications on work zone design and traffic control decision processes , 2008 .

[37]  E. Martins,et al.  A computational improvement for a shortest paths ranking algorithm , 1994 .

[38]  S. Thomas Ng,et al.  Optimizing Construction Time and Cost Using Ant Colony Optimization Approach , 2008 .

[39]  Tomoya Shibayama,et al.  OF PAVEMENT NETWORK MAINTENANCE AND REHABILITATION PLANNING USING SHUFFLED COMPLEX EVOLUTION , 2007 .

[40]  Thomas Schnell,et al.  Evaluation of Traffic Flow Analysis Tools Applied to Work Zones Based on Flow Data Collected in the Field , 2002 .

[41]  Steven D Schrock,et al.  IMPROVING TRAFFIC CONTROL EFFECTIVENESS IN COMPLEX WORK ZONES , 2003 .

[42]  Stuart D. Anderson,et al.  Process for Selecting Strategies for Rehabilitation of Rigid Pavements Under High Traffic Volumes , 2003 .

[43]  Xin Chen,et al.  URMS. A graphical urban roadway management system at network level , 1993 .

[44]  Hsin-Yun Lee Optimizing schedule for improving the traffic impact of work zone on roads , 2009 .

[45]  Wei-Bin Zhang Study of Integrated Corridor Management for San Francisco Bay Area I-880 Area Corridor , 2008 .

[46]  Asif Faiz,et al.  Areawide Performance-Based Rehabilitation and Maintenance Contracts for Low-Volume Roads , 1999 .

[47]  Yafeng Yin,et al.  Impact of Lane Closures on Roadway Capacity. Part C: Modeling Diversion Propensity at Work Zones , 2008 .

[48]  Yingfeng Li,et al.  Effectiveness of Temporary Traffic Control Measures in Highway Work Zones , 2007 .

[49]  Mike Bishop,et al.  INTEGRATED ASSET MANAGEMENT GUIDELINES FOR ROAD NETWORKS , 2002 .

[50]  Mark A. Turnquist,et al.  Optimization Modeling for Enhanced Network-Level Pavement Management System , 1996 .

[51]  Jon Bottom,et al.  Dynamic Traffic Assignment: A Primer , 2011 .

[52]  Anthony P Voigt,et al.  Accelerating Major Freeway Reconstruction Projects: The Houston Experience , 1998 .

[53]  Fred L. Mannering,et al.  Weekend Closure for Construction of Asphalt Overlay on Urban Highway , 2000 .

[54]  Lisa K. Spainhour,et al.  ANALYSIS OF WORK ZONE MOT DATA COLLECTION AND USAGE PROCEDURES , 2002 .

[55]  Jian John Lu,et al.  Integrated Work Zone Safety Management System and Analysis Tools , 2008 .

[56]  Yimin Zhu,et al.  Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects , 2009 .

[57]  Gerald L Ullman,et al.  Final Report for NCHRP Report 581: Design of Construction Work Zones on High-Speed Highways , 2006 .

[58]  Catharina Sikow,et al.  IMPACT ANALYSIS OF ROAD KEEPING: CASE STUDY OF LAPLAND DISTRICT IN FINLAND , 1994 .

[59]  Conrad L Dudek,et al.  Sequential Warning-Light System for Work-Zone Lane Closures , 2001 .

[60]  Pothu Raju Khanta Evaluation of Traffic Simulation Models for Work Zones in the New England Area , 2008 .

[61]  Laszlo Gaspar COMPILATION OF FIRST HUNGARIAN NETWORK-LEVEL PAVEMENT MANAGEMENT SYSTEM , 1994 .

[62]  Samuel Labi,et al.  Identifying the Appropriate Contract Types for Highway Maintenance and Rehabilitation Projects on the Basis of Project Characteristics , 2009 .

[63]  Zongzhi Li,et al.  Highway Work Zone Safety Audits at the Construction Stage , 2009 .

[64]  Steven D Schrock,et al.  Examination of Effectiveness of Early Merge Work-Zone Signing , 2009 .

[65]  Eul-Bum Lee,et al.  Planning urban highway reconstruction with traffic demand affected by construction schedule , 2005 .

[66]  Peter T. Savolainen,et al.  Evaluation of Motorist Awareness System , 2009 .

[67]  Der-Horng Lee,et al.  SCHEDULING OF LANE CLOSURES USING GENETIC ALGORITHMS WITH TRAFFIC ASSIGNMENTS AND DISTRIBUTED SIMULATIONS , 2004 .

[68]  Adeel Z Lari,et al.  Advanced Acquisition of Right-of-Way: Best Practices and Corridor Case Studies , 2009 .

[69]  Rahim F Benekohal,et al.  Comparative Analysis Report: The Benefits of Using Intelligent Transportation Systems in Work Zones , 2008 .

[70]  Lily Elefteriadou,et al.  Impact of Lane Closures on Roadway Capacity. Part B: Arterial Work Zone Capacity , 2008 .

[71]  Eul-Bum Lee,et al.  Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks , 2008 .

[72]  E. Queirós Vieira Martins An algorithm for ranking paths in acyclic networks , 1983 .

[73]  Will Davis,et al.  QuickZone Improvement for Rural Freeway and Model Validation , 2009 .

[74]  Chandra Bahadur Shrestha DEVELOPING A COMPUTER-AIDED METHODOLOGY FOR DISTRICT ROAD NETWORK PLANNING AND PRIORITIZATION IN NEPAL , 2003 .

[75]  Michelle L. Povinelli Variable speed limit , 2006 .

[76]  Mehmet Emre Bayraktar,et al.  A decision support system for selecting the optimal contracting strategy in highway work zone projects , 2009 .

[77]  Eul-Bum Lee,et al.  Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors , 2000 .

[78]  James E Bryden,et al.  A PROCEDURE FOR ASSESSING AND PLANNING NIGHTTIME HIGHWAY CONSTRUCTION AND MAINTENANCE , 2002 .

[79]  Klong Luang,et al.  NETWORK-LEVEL MAINTENANCE PLANNING USING PAVEMENT VALUATION , 2003 .

[80]  P Pakkala Innovative project delivery methods for infrastructure: an international perspective , 2002 .

[81]  Thomas W. Hartmann,et al.  Revised Process for Work Zone Decision Making Based on Quantitative Performance Measures , 2009 .

[82]  Caroline B. Cooney Hit the Road , 2006 .

[83]  Kamal Golabi,et al.  INNOVATIVE PAVEMENT MANAGEMENT AND PLANNING SYSTEM FOR ROAD NETWORK OF PORTUGAL , 2003 .

[84]  William Outcalt Work Zone Speed Control , 2009 .

[85]  J. A. Obrien Management Information System , 2004 .