Train timetabling by skip-stop planning in highly congested lines
暂无分享,去创建一个
[1] Leonardo Lamorgese,et al. An exact micro–macro approach to cyclic and non-cyclic train timetabling , 2017 .
[2] Shifeng Wang,et al. Optimizing train stopping patterns and schedules for high-speed passenger rail corridors , 2016 .
[3] Dennis Huisman,et al. The New Dutch Timetable: The OR Revolution , 2008, Interfaces.
[4] Dario Pacciarelli,et al. A branch and bound algorithm for scheduling trains in a railway network , 2007, Eur. J. Oper. Res..
[5] Ziyou Gao,et al. Dynamic passenger demand oriented metro train scheduling with energy-efficiency and waiting time minimization: Mixed-integer linear programming approaches , 2017 .
[6] A. Jamili,et al. Robust stop-skipping patterns in urban railway operations under traffic alteration situation , 2015 .
[7] Leo Kroon,et al. Rescheduling a metro line in an over-crowded situation after disruptions , 2016 .
[8] Paolo Toth,et al. Scheduling extra freight trains on railway networks , 2010 .
[9] David Canca,et al. Setting lines frequency and capacity in dense railway rapid transit networks with simultaneous passenger assignment , 2016 .
[10] Rob M.P. Goverde,et al. An integrated micro–macro approach to robust railway timetabling , 2016 .
[11] Wenliang Zhou,et al. Simultaneous passenger train routing and timetabling using an efficient train-based Lagrangian relaxation decomposition , 2016 .
[12] Paolo Toth,et al. Optimization Problems in Passenger Railway Systems , 2011 .
[13] Paolo Toth,et al. A Lagrangian heuristic algorithm for a real-world train timetabling problem , 2006, Discret. Appl. Math..
[14] Matteo Fischetti,et al. Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..
[15] Michael R. Bussieck,et al. Discrete optimization in public rail transport , 1997, Math. Program..
[16] Ziyou Gao,et al. Joint optimal train regulation and passenger flow control strategy for high-frequency metro lines , 2017 .
[17] Dirk Cattrysse,et al. Reducing the passenger travel time in practice by the automated construction of a robust railway timetable , 2016 .
[18] Paolo Toth,et al. Timetable Optimization for High-Speed Trains at Chinese Railways , 2016, Electron. Notes Discret. Math..
[19] Matthias Ehrgott,et al. Railway track allocation: models and methods , 2011, OR Spectr..
[20] Marc Nunkesser,et al. Scheduling Additional Trains on Dense Corridors , 2009, SEA.
[21] Paolo Toth,et al. A Survey of Optimization Models for Train Routing and Scheduling , 1998, Transp. Sci..
[22] Lixing Yang,et al. Collaborative optimization for train scheduling and train stop planning on high-speed railways , 2016 .
[23] Chung-Hsing Yeh,et al. A Multiobjective Model for Passenger Train Services Planning: Application to Taiwan's High-Speed Rail Line , 2000 .
[24] Ziyou Gao,et al. Energy-efficient metro train rescheduling with uncertain time-variant passenger demands: An approximate dynamic programming approach , 2016 .
[25] Anita Schöbel,et al. Line planning in public transportation: models and methods , 2012, OR Spectr..
[26] Paolo Toth,et al. Chapter 3 Passenger Railway Optimization , 2007, Transportation.
[27] Xuesong Zhou,et al. Train scheduling for minimizing passenger waiting time with time-dependent demand and skip-stop patterns: Nonlinear integer programming models with linear constraints , 2015 .
[28] Valentina Cacchiani,et al. Approaches to a real-world train timetabling problem in a railway node , 2016 .
[29] Christian Liebchen,et al. The First Optimized Railway Timetable in Practice , 2008, Transp. Sci..
[30] Steven Harrod,et al. A tutorial on fundamental model structures for railway timetable optimization , 2012 .
[31] Johanna Törnquist,et al. Computer-based decision support for railway traffic scheduling and dispatching: A review of models and algorithms , 2005, ATMOS.
[32] Erik T. Verhoef,et al. Train Commuters' Scheduling Preferences: Evidence from a Large-Scale Peak Avoidance Experiment , 2015 .
[33] Erhan Kozan,et al. Techniques for inserting additional trains into existing timetables , 2009 .
[34] Michel Bierlaire,et al. Passenger centric train timetabling problem , 2016 .
[35] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[36] Paolo Toth,et al. Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..
[37] Huiling Fu,et al. A hierarchical line planning approach for a large-scale high speed rail network: The China case , 2015 .
[38] Paolo Toth,et al. A tutorial on non-periodic train timetabling and platforming problems , 2015, EURO J. Transp. Logist..
[39] Miguel A. Salido,et al. An Efficient Method to Schedule New Trains on a Heavily Loaded Railway Network , 2004, IBERAMIA.