Achieving Value for Money (VFM) in Construction Projects

Value for Money is the client’s assessment of the project delivered and/or services rendered by the various project stakeholders as it met the pre-determined objectives. The study focused on ways by which the required value for money can be achieved in a project, these includes detailed risk analysis and appropriate risk allocation, drive for faster project completion, curtailment in project cost escalation, encouragement of innovation in project development, preparation of a detailed specification etc. Highlighted among management tools that can aid the achievement of the desired VFM includes Life Cycle Cost analysis, Value Management, Building Information Modelling, and Lean Construction methods. The study argued for the ex-ante VFM assessment to be carried out at the design stage of a project; the importance of an ex-post VFM assessment after project completion was stressed, this is due to the fact that it helps to determine whether or not value for money has actually been delivered. Meanwhile, the barriers to achieving value for money on investment for the client were discussed with recommendations for improving VFM practices. The findings of this research provide necessary information and instruments to assist the various project stakeholders to make informed and supportable decisions. Keywords: Value for Money (VFM), VFM techniques, barriers, construction projects

[1]  Catharina Elizabeth Coetzee Value management in the construction industry: what does it entail and is it a worthwhile practice? , 2010 .

[2]  Eric Gabriel The lean approach to project management , 1997 .

[3]  Mei-yung Leung,et al.  Value management in construction projects , 2001 .

[4]  Dominik Holzer,et al.  Rethinking the contractual context for Building Information Modelling (BIM) in the Australian built environment industry , 2013 .

[5]  Christine Pasquire,et al.  Delivering sustainability through value management: Concept and performance overview , 2005 .

[6]  D. Jaggar,et al.  Design and the Economics of Building , 1995 .

[7]  Bandar Seri Iskandar,et al.  A CRITICAL REVIEW OF VALUE MANAGEMENT AND WHOLE LIFE COSTING ON CONSTRUCTION PROJECTS , 2013 .

[8]  M. Abubakar,et al.  Contractors Perception of the Factors Affecting Building Information Modelling (BIM) Adoption in the Nigerian Construction Industry , 2014 .

[9]  A. Akintoye,et al.  Achieving best value in private finance initiative project procurement , 2003 .

[10]  Value for money in project procurement , 2014 .

[11]  David Arditi,et al.  Life-Cycle Costing in Municipal Construction Projects , 1996 .

[12]  Salman Azhar,et al.  BIM-based Sustainability Analysis : An Evaluation of Building Performance Analysis Software , 2009 .

[13]  Gd Wood,et al.  Value management practices of leading UK cost consultants , 2005 .

[14]  John Connaughton,et al.  Value management in construction: a client's guide , 1996 .

[15]  A. D. D. Loû Value for Money evaluation in PPPs: difficulties and developments , 2012 .

[16]  Simon A. Austin,et al.  Applying future industrialised processes to construction , 2007 .

[17]  C. Campbell,et al.  Quality assurance and the development of course programmes , 2002 .

[18]  Andrew Cox,et al.  Strategic Procurement in Construction: Towards better practice in the management of construction supply chains , 1998 .

[19]  Olanrewaju Ashola AbdulLateef A CRITICAL REVIEW OF VALUE MANAGEMENT AND WHOLE LIFE COSTING TECHNIQUES ON THE CONSTRUCTION PROJECTS , 2013 .

[20]  Roger Flanagan,et al.  Whole Life Appraisal for Construction , 2005 .

[21]  Roy Woodhead,et al.  Value Management: Improving capabilities , 2001 .

[22]  Adjo Amekudzi,et al.  The State of the Practice of Value for Money Analysis in Comparing Public Private Partnerships to Traditional Procurements , 2008 .

[23]  F. Lawrence Bennett,et al.  The Management of Construction: A Project Lifecycle Approach , 2003 .

[24]  Michael F. Dallas,et al.  Value and Risk Management: A Guide to Best Practice , 2008 .

[25]  Christine Pasquire,et al.  Delivering best value in highways major maintenance schemes: case study , 2009 .

[26]  P. Burger,et al.  How To Attain Value for Money: Comparing PPP and Traditional Infrastructure Public Procurement , 2011 .

[27]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .