Waste Isolation Pilot Plant (WIPP) performance assessment consists of twenty-four conceptual models that are used to describe repository performance during the 10,000 year regulatory time period following closure of the facility. Following the recertification of the repository in March of 2006, Sandia National Laboratories and the U. S. Department of Energy (DOE) began a set of activities to identify which models could be improved and updated by inclusion of data from recent repository investigations. Sandia initiated this process by conducting a review of the performance assessment models to determine which models should be updated. Sandia provided the DOE with a list of recommendations, and after discussions with the DOE, Sandia proceeded with a set of scoping calculations to identify the impacts of these changes on modeling repository performance. This paper describes the methodology that Sandia used to determine which changes should be proposed and the impact of some of these changes on estimates of radionuclide releases that could occur in the event of inadvertent human intrusion into the repository. This paper is the first in a series of papers about the proposed changes. The other papers detail the specific changes and the justification for those changes to the models and parameters.
[1]
Byoung Yoon Park,et al.
Prediction of the Extent of the Disturbed Rock Zone around a WIPP Disposal Room, USA
,
2008
.
[2]
C. G. Herrick,et al.
Recommendation for the Lower Limit of the Waste Shear Strength (Parameter BOREHOLE : TAUFAIL) - 8097
,
2008
.
[3]
F. Hansen,et al.
WIPP Room Evolution and Performance Assessment Implications
,
2006
.
[4]
Byoung Yoon Park,et al.
Extent of the Disturbed Rock Zone Around a WIPP Disposal Room
,
2008
.
[5]
D. J. Clayton,et al.
Impact of Proposed Disturbed Rock Zone Conceptual Model Modifications to the Waste Isolation Pilot Plant Performance Assessment—8090
,
2008
.