Stabilizing control, system preventing loss of synchronism from extension and its actual operating experience
暂无分享,去创建一个
[1] A. A. Fouad,et al. Calculation of Generation-Shedding Requirements of the B. C. Hydro System Using Transient Energy Functions , 1986, IEEE Transactions on Power Systems.
[2] L. H. Fink. Emergency Control Practices A report prepared for the System Control Subcommittee of the Power System Engineering Committee by the Task Force on Emergency Control , 1985, IEEE Power Engineering Review.
[3] L. H. Fink,et al. Emergency Control Practices , 1985, IEEE Transactions on Power Apparatus and Systems.
[4] Ryouichi Tsukui,et al. Fast generation shedding equipment based on the observation of swings of generators , 1988 .