Some complexity results and an efficient algorithm for quay crane scheduling problem
暂无分享,去创建一个
[1] Iris F. A. Vis,et al. Sequencing Two Cooperating Automated Stacking Cranes in a Container Terminal , 2010, Transp. Sci..
[2] Christian Bierwirth,et al. A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..
[3] Carlos F. Daganzo,et al. THE CRANE SCHEDULING PROBLEM , 1989 .
[4] Zhixin Liu,et al. Single machine scheduling to minimize maximum lateness subject to release dates and precedence constraints , 2010, Comput. Oper. Res..
[5] K. L. Mak,et al. Quay crane scheduling in container terminals , 2006 .
[6] Ming Liu,et al. A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem , 2013, Comput. Oper. Res..
[7] Marc E. Posner,et al. Generating Experimental Data for Computational Testing with Machine Scheduling Applications , 2001, Oper. Res..
[8] Andrew Lim,et al. A critical-shaking neighborhood search for the yard allocation problem , 2006, Eur. J. Oper. Res..
[9] Der-Horng Lee,et al. An improved approach for quay crane scheduling with non-crossing constraints , 2010 .
[10] Andrew Lim,et al. A m‐parallel crane scheduling problem with a non‐crossing constraint , 2007 .
[11] Jan Karel Lenstra,et al. Complexity of Scheduling under Precedence Constraints , 1978, Oper. Res..
[12] Erkki Mäkinen,et al. On a parallel machine scheduling problem with precedence constraints , 2006, J. Sched..
[13] Anne V. Goodchild,et al. Double-Cycling Strategies for Container Ships and Their Effect on Ship Loading and Unloading Operations , 2006, Transp. Sci..
[14] Diego Klabjan,et al. Multiship Crane Sequencing with Yard Congestion Constraints , 2009, Transp. Sci..
[15] Nathan Huynh,et al. An efficient genetic algorithm for solving the quay crane scheduling problem , 2012, Expert Syst. Appl..
[16] Pasquale Legato,et al. Modeling and solving rich quay crane scheduling problems , 2012, Comput. Oper. Res..
[17] Akio Imai,et al. Multi-objective simultaneous stowage and load planning for a container ship with container rehandle in yard stacks , 2006, Eur. J. Oper. Res..
[18] Mark Goh,et al. An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem , 2014, Eur. J. Oper. Res..
[19] Lei Wang,et al. Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures , 2006 .
[20] Stefan Voß,et al. Operations research at container terminals: a literature update , 2007, OR Spectr..
[21] Lixin Miao,et al. Quay crane scheduling with non-interference constraints in port container terminals , 2008 .
[22] Akio Imai,et al. The Dynamic Berth Allocation Problem for a Container Port , 2001 .
[23] Christian Bierwirth,et al. A unified approach for the evaluation of quay crane scheduling models and algorithms , 2011, Comput. Oper. Res..
[24] Christian Bierwirth,et al. A fast heuristic for quay crane scheduling with interference constraints , 2009, J. Sched..
[25] Gilbert Laporte,et al. A branch‐and‐cut algorithm for the quay crane scheduling problem in a container terminal , 2006 .
[26] Maurice Queyranne,et al. Approximation Bounds for a General Class of Precedence Constrained Parallel Machine Scheduling Problems , 1998, SIAM J. Comput..
[27] Christian Bierwirth,et al. A Framework for Integrated Berth Allocation and Crane Operations Planning in Seaport Container Terminals , 2013, Transp. Sci..
[28] Zhiqiang Lu,et al. A heuristic for the quay crane scheduling problem based on contiguous bay crane operations , 2012, Comput. Oper. Res..
[29] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..