Method to produce field instructions from product and process models for cast-in-place concrete operations
暂无分享,去创建一个
[1] Gijsbertus T. “Bart” Luiten,et al. AUTOMATING COMMUNICATION IN CIVIL ENGINEERING , 1997 .
[2] Jarmo Laitinen. Model based construction process management , 1998 .
[3] Tamer E. El-Diraby,et al. A semantic framework to support corporate memory management in building construction , 2006 .
[4] Q. He,et al. Striving for a total integration of CAD , CAPP , CAM and CNC , 2004 .
[5] H. W. Parker,et al. Productivity improvement in construction , 1988 .
[6] Olli Seppänen,et al. Performance Measurement Using Location-Based Status Data , 2005 .
[7] Raymond E. Levitt,et al. OARPLAN: Generating project plans by reasoning about objects, actions and resources , 1988, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.
[8] Martin Fischer,et al. An Ontology for Relating Features with Activities to Calculate Costs , 2003 .
[9] Thomas R. Gruber,et al. A translation approach to portable ontology specifications , 1993, Knowl. Acquis..
[10] Kjeld Svidt,et al. Ontologies to Support RFID‐Based Link between Virtual Models and Construction Components , 2010, Comput. Aided Civ. Infrastructure Eng..
[11] Martin Fischer,et al. A Work Instruction Template for Cast-In-Place Concrete Construction Laborers , 2008 .
[12] Martin Fischer,et al. THE SCOPE AND ROLE OF INFORMATION TECHNOLOGY IN CONSTRUCTION , 2004 .
[13] A. Kochhar,et al. Manufacturing best practice and performance studies: a critique , 2002 .
[14] Burcu Akinci,et al. Formalization and Automation of Time-Space Conflict Analysis , 2002 .
[15] Rita Hattemer-Apostel,et al. Standard operating procedures ‐ a novel perspective , 2001 .
[16] Mark R. Cutkosky,et al. A methodology and computational framework for concurrent product and process design , 1990 .
[17] Photios G. Ioannou,et al. General-purpose systems for effective construction simulation , 1999 .
[18] John Boardman,et al. Methodology for modelling a project management control environment , 1987 .
[19] Iris D. Tommelein,et al. WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .
[20] John C. Kunz,et al. Engineering test cases to motivate the formalization of an AEC project model as a directed acyclic graph of views and dependencies , 2004, J. Inf. Technol. Constr..
[21] John C. Kunz,et al. Perspectors: composable, reusable reasoning modules to construct an engineering view from other engineering views , 2004, Adv. Eng. Informatics.
[22] Karhu. A model based approach for construction process modelling , 2001 .
[23] Chimay J. Anumba,et al. Process model for client requirements processing in construction , 2000, Bus. Process. Manag. J..
[24] Annette L. Stumpf,et al. Object-Oriented Model for Integrating Construction Product and Process Information , 1996 .
[25] Anders Ekholm,et al. ISO 12006-2 and IFC - Prerequisites for Coordination of Standards for Classification and Interoperability , 2005, J. Inf. Technol. Constr..
[26] Jae-Jun Kim,et al. Work-Package–Process Model for Piping Construction , 1995 .
[27] Robert Meersman,et al. Data modelling versus ontology engineering , 2002, SGMD.
[28] Mahesh S. Raisinghani,et al. An empirical study of best practices in virtual teams , 2001, Inf. Manag..