Method to produce field instructions from product and process models for cast-in-place concrete operations

Abstract The state-of-practice method to produce good and formal work instructions for construction laborers takes time, is error prone and produces outcomes with inconsistent format and content. That is why contractors rely on verbal work instructions in spite of the field mistakes and inefficiencies that this poor communication produces. Our research addresses the underlying scientific problem of this practical quandary: the lack of a formal method that defines the steps and information needed to produce good work instructions from a company's best practices and a project's 3D product model. This paper describes an automated method (Field Instructions from Product And Process Models, FIPAPM) to systematically produce work instructions with a predefined format and content (field instructions template) for cast-in-place (CIP) concrete operations using design and construction information contained in product and process models. The paper also explains the information schemas needed by the FIPAPM method to produce field instructions. We developed this method and information schemas through active project participation and computer prototyping. Initial validation of the FIPAPM method shows that it enables a faster, more correct and more consistent production of good work instructions than the state-of-practice method.

[1]  Gijsbertus T. “Bart” Luiten,et al.  AUTOMATING COMMUNICATION IN CIVIL ENGINEERING , 1997 .

[2]  Jarmo Laitinen Model based construction process management , 1998 .

[3]  Tamer E. El-Diraby,et al.  A semantic framework to support corporate memory management in building construction , 2006 .

[4]  Q. He,et al.  Striving for a total integration of CAD , CAPP , CAM and CNC , 2004 .

[5]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[6]  Olli Seppänen,et al.  Performance Measurement Using Location-Based Status Data , 2005 .

[7]  Raymond E. Levitt,et al.  OARPLAN: Generating project plans by reasoning about objects, actions and resources , 1988, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[8]  Martin Fischer,et al.  An Ontology for Relating Features with Activities to Calculate Costs , 2003 .

[9]  Thomas R. Gruber,et al.  A translation approach to portable ontology specifications , 1993, Knowl. Acquis..

[10]  Kjeld Svidt,et al.  Ontologies to Support RFID‐Based Link between Virtual Models and Construction Components , 2010, Comput. Aided Civ. Infrastructure Eng..

[11]  Martin Fischer,et al.  A Work Instruction Template for Cast-In-Place Concrete Construction Laborers , 2008 .

[12]  Martin Fischer,et al.  THE SCOPE AND ROLE OF INFORMATION TECHNOLOGY IN CONSTRUCTION , 2004 .

[13]  A. Kochhar,et al.  Manufacturing best practice and performance studies: a critique , 2002 .

[14]  Burcu Akinci,et al.  Formalization and Automation of Time-Space Conflict Analysis , 2002 .

[15]  Rita Hattemer-Apostel,et al.  Standard operating procedures ‐ a novel perspective , 2001 .

[16]  Mark R. Cutkosky,et al.  A methodology and computational framework for concurrent product and process design , 1990 .

[17]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .

[18]  John Boardman,et al.  Methodology for modelling a project management control environment , 1987 .

[19]  Iris D. Tommelein,et al.  WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .

[20]  John C. Kunz,et al.  Engineering test cases to motivate the formalization of an AEC project model as a directed acyclic graph of views and dependencies , 2004, J. Inf. Technol. Constr..

[21]  John C. Kunz,et al.  Perspectors: composable, reusable reasoning modules to construct an engineering view from other engineering views , 2004, Adv. Eng. Informatics.

[22]  Karhu A model based approach for construction process modelling , 2001 .

[23]  Chimay J. Anumba,et al.  Process model for client requirements processing in construction , 2000, Bus. Process. Manag. J..

[24]  Annette L. Stumpf,et al.  Object-Oriented Model for Integrating Construction Product and Process Information , 1996 .

[25]  Anders Ekholm,et al.  ISO 12006-2 and IFC - Prerequisites for Coordination of Standards for Classification and Interoperability , 2005, J. Inf. Technol. Constr..

[26]  Jae-Jun Kim,et al.  Work-Package–Process Model for Piping Construction , 1995 .

[27]  Robert Meersman,et al.  Data modelling versus ontology engineering , 2002, SGMD.

[28]  Mahesh S. Raisinghani,et al.  An empirical study of best practices in virtual teams , 2001, Inf. Manag..