Supply Chain Modeling for BIM-oriented Construction Schedule Management: CODP based Classification Approach

Providing accurate, complete and real-time supply and logistics information for construction schedule control is a significant issue in construction management. This paper aims to design a holistic control model for BIM-oriented CSC (Construction Supply Chain). First, this paper analyzes the information requirement of different supply nodes and presents the strategies of lead time management influenced by uncertainty based on CODP (Customer Order Decoupling Point) classification thinking. In the next stage of the study, efforts are made to integrate BIM models into CSC according to CODP-based rule and attention level setting. The approach of BIM-oriented CSC modeling focuses on supply information integration with IFC model as well as the information exchange process among key CSC vertices. It is believed that the approach applied in CSC modeling can help elevate construction schedule controlling, supply lead time planning and BIM model development from the operational level to strategic level.

[1]  Petri T. Helo,et al.  Logistics information systems: An analysis of software solutions for supply chain co-ordination , 2005, Ind. Manag. Data Syst..

[2]  Denis Royston Towill,et al.  Using the Information Decoupling Point to Improve Supply Chain Performance , 1999 .

[3]  Víctor Yepes,et al.  Complete fuzzy scheduling and fuzzy earned value management in construction projects , 2012 .

[4]  S. Buckley,et al.  JOBSITE LOGISTIC SIMULATION IN MECHANIZED TUNNELING , 2014 .

[5]  Sven Spieckermann,et al.  Intelligent BIM-based construction scheduling using discrete event simulation , 2012, Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC).

[6]  Jorge Verissimo Pereira,et al.  The new supply chain's frontier: Information management , 2009, Int. J. Inf. Manag..

[7]  Jc Johan Wortmann Production management systems for one-of-a-kind products , 1992 .

[8]  Peter E.D. Love,et al.  A seamless supply chain management model for construction , 2004 .

[9]  Osama Moselhi,et al.  Fuzzy dynamic programming for optimized scheduling of repetitive construction projects , 2013, 2013 Joint IFSA World Congress and NAFIPS Annual Meeting (IFSA/NAFIPS).

[10]  Markus König,et al.  Reactive scheduling based on actual logistics data by applying simulation-based optimization , 2015 .

[11]  Matthias Dehmer,et al.  Information processing in complex networks: Graph entropy and information functionals , 2008, Appl. Math. Comput..

[12]  Kerry London,et al.  Construction supply chain modeling : a research review and interdisciplinary research agenda , 2004 .

[13]  Andrew N. Baldwin,et al.  A Data Flow Model to Plan and Manage the Building Design Process , 1996 .