Accelerating COTS Middleware Acquisition: The i-Mate Process

COTS middleware speeds e-business application deployment but can be difficult to select. The i-Mate tool provides a proven, structured software engineering process for COTS middleware acquisition. Using i-Mate in six major projects for a wide range of organizations led to highly visible, accountable, and ultimately reliable selections of COTS middleware products in greatly compressed time scales. This significantly reduced the risks associated with inappropriate product selections and made these projects more likely to succeed.

[1]  A. M. Wilson,et al.  Alarm Management And Its Importance In Ensuring Safety , 1998 .

[2]  P. Andow,et al.  Abnormal Situation Management: A Major US Programme to Improve Management of Abnormal Situations , 1997 .

[3]  Paul Brebner,et al.  The rigorous evaluation of Enterprise Java Bean technology , 2001, Proceedings 15th International Conference on Information Networking.

[4]  Santiago Comella-Dorda,et al.  A Process for COTS Software Product Evaluation , 2002, ICCBSS.

[5]  Ian Gorton,et al.  Streamlining the Acquisition Process for Large-Scale COTS Middleware Components , 2002, ICCBSS.

[6]  Arvinder Kaur,et al.  Component Based Software Engineering , 2010 .

[7]  D. C. Brown,et al.  Too much of a good thing?-alarm management experience in BP Oil. 1. Generic problems with DCS alarm systems , 1997 .

[8]  George T. Heineman,et al.  Component-Based Software Engineering: Putting the Pieces Together , 2001 .

[9]  Jyrki Kontio,et al.  A case study in applying a systematic method for COTS selection , 1996, Proceedings of IEEE 18th International Conference on Software Engineering.

[10]  Ian Gorton,et al.  Software component quality assessment in practice: successes and practical impediments , 2002, Proceedings of the 24th International Conference on Software Engineering. ICSE 2002.

[11]  David S. Linthicum,et al.  Enterprise Application Integration with CORBA Component and Web-Based Solutions , 1999 .

[12]  Patricia K. Lawlis,et al.  A Formal Process for Evaluating COTS Software Products , 2001, Computer.

[13]  M. L. Bransby,et al.  Alarm Management In The Chemical And Power Industries: Results Of A Survey For The HSE , 1998 .

[14]  Ian Gorton,et al.  The Devil is in the Detail: A Comparison of CORBA Object Transaction Services , 2000, OOIS.

[15]  Margaret O'Donnell,et al.  Too much of a good thing?-alarm management experience in BP Oil. 2. Implementation of alarm management at Grangemouth Refinery , 1997 .

[16]  Jack Ferguson Software Acquisition Capability Maturity Model (SA-CMM) , 2002 .