Life-cycle assessment (LCA) of concrete with recycled aggregates (RAs)

This chapter focuses on the life-cycle assessment (LCA) of aggregates obtained by recycling of demolished concrete - recycled concrete aggregates (RCA), and concrete made with such aggregates - recycled aggregate concrete (RAC). It includes methodological aspects, such as the treatment of allocation in the case of concrete recycling. The results of LCA case studies on two different RCA applications - as aggregate in structural RAC concrete and as material for road base, are presented. The potentials and limitations of LCA in comparing different waste management scenarios are discussed based on the published research. Recommendations regarding future research are given.

[1]  Nik.D. Oikonomou,et al.  Recycled concrete aggregates , 2005 .

[2]  H. D. Sloot,et al.  Release of major elements from recycled concrete aggregates and geochemical modelling , 2009 .

[3]  T. Ekvall A market-based approach to allocation at open-loop recycling , 2000 .

[4]  M. Huijbregts,et al.  Handbook on Life Cycle Assessment: Operational Guide to the ISO Standards , 2002 .

[5]  Giovanni Andrea Blengini,et al.  Life cycle of buildings, demolition and recycling potential: A case study in Turin, Italy , 2009 .

[6]  Valeria Ibáñez-Forés,et al.  Life cycle assessment of construction and demolition waste management systems: a Spanish case study , 2012, The International Journal of Life Cycle Assessment.

[7]  Antonio Aguado,et al.  ENVIRONMENTAL ASSESSMENT OF CEMENT BASED PRODUCTS: LIFE CYCLE ASSESSMENT AND THE ECOCONCRETE SOFTWARE TOOL , 2005 .

[8]  J. de Brito,et al.  Environmental life cycle assessment of concrete made with fine recycled concrete aggregates , 2007 .

[9]  S. Nagataki,et al.  Assessment of recycling process induced damage sensitivity of recycled concrete aggregates , 2004 .

[10]  P. Van den Heede,et al.  Environmental impact and life cycle assessment (LCA) of traditional and ‘green’ concretes: Literature review and theoretical calculations , 2012 .

[11]  Phil Purnell,et al.  Embodied carbon dioxide in concrete: Variation with common mix design parameters , 2012 .

[12]  Joost G. Vogtländer,et al.  Allocation in recycling systems , 2001 .

[13]  Defne Apul,et al.  A life cycle based environmental impacts assessment of construction materials used in road construction , 2010 .

[14]  André Coelho,et al.  Influence of construction and demolition waste management on the environmental impact of buildings. , 2012, Waste management.

[15]  Frank Werner,et al.  Economic Allocation in LCA: A Case Study About Aluminium Window Frames , 2000 .

[16]  Ahmad Shayan,et al.  Value-added Utilisation of Waste Glass in Concrete , 2002 .

[17]  S. Marinković,et al.  Concrete Recycling in Life Cycle assessment , 2010 .

[18]  Gian Andrea Blengini,et al.  Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix , 2010 .

[19]  Liselotte Schebek,et al.  Closed-loop recycling of construction and demolition waste in Germany in view of stricter environmental threshold values , 2006, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.

[20]  O Ortiz,et al.  Environmental performance of construction waste: Comparing three scenarios from a case study in Catalonia, Spain. , 2010, Waste management.

[21]  Anna Björklund,et al.  What life-cycle assessment does and does not do in assessments of waste management. , 2007, Waste management.

[22]  P Eskola,et al.  Life-cycle impacts of the use of industrial by-products in road and earth construction. , 2001, Waste management.

[23]  R. Heijungs,et al.  Economic allocation: Examples and derived decision tree , 2004 .

[24]  İlker Bekir Topçu,et al.  Properties of concrete containing waste glass , 2004 .

[25]  Petr Hájek,et al.  Life cycle assessments of concrete structures – a step towards environmental savings , 2011 .

[26]  Eric Forssberg,et al.  The potential leachability from natural road construction materials , 1999 .

[27]  Agnès Jullien,et al.  Development of a depletion indicator for natural resources used in concrete , 2010 .

[29]  M. Curran Life Cycle Assessment , 1994 .

[30]  Tomas Ekvall,et al.  Open-loop recycling: Criteria for allocation procedures , 1997 .

[31]  Margareta Wahlström,et al.  Environmental quality assurance system for use of crushed mineral demolition wastes in road constructions , 2000 .