Prioritizing Engineering/Design Deliverables for a Quality Defect Analysis
暂无分享,去创建一个
[1] W. B. Ledbetter,et al. Causes of Quality Deviations in Design and Construction , 1992 .
[2] Keith R. Molenaar,et al. Analysis of Owner’s Design and Construction Quality Management Approaches in Design/Build Projects , 2004 .
[3] Peter E.D. Love,et al. Design Error Classification, Causation, and Prevention in Construction Engineering , 2010 .
[4] Shih-Tong Lu,et al. Statistical analysis of causes for change orders in metropolitan public works , 2004 .
[5] Gonzalo Perez,et al. Improved Design Review through Web Collaboration , 2004 .
[6] Richard L. Tucker,et al. FORECASTING DESIGN-RELATED PROBLEMS - CASE STUDY , 1991 .
[7] Peter E.D. Love,et al. BENCHMARKING, BENCHACTION, AND BENCHLEARNING: REWORK MITIGATION IN PROJECTS , 2003 .
[8] James T. O'Connor,et al. Industrial Project Constructability Improvement , 1986 .
[9] Neil N. Eldin. Management of Engineering/Design Phase , 1991 .
[10] Andi,et al. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process , 2003 .
[11] Liang Y Liu,et al. Design Review Checking System with Corporate Lessons Learned , 2003 .
[12] Peter G. Belitsos. The Impact of Engineering Drawing Standards on Product Quality , 1980 .
[13] Donn E. Hancher,et al. Framework for Design‐Quality‐Review Data‐Base System , 1990 .
[14] E. William East,et al. Abstracting Lessons Learned from Design Reviews , 1996 .
[15] Helmut M. Haydl,et al. DESIGN AND CONSTRUCTION ERRORS--CASE STUDIES , 2000 .