Cost and reliability evaluation for power systems with multiple energy-limited hydroelectric units
暂无分享,去创建一个
[1] Nissan Levin,et al. Optimal Mix Algorithms with Limited-Energy Plants , 1985, IEEE Transactions on Power Apparatus and Systems.
[2] J. Stremel,et al. Production Costing Using the Cumulant Method of Representing the Equivalent Load Curve , 1980, IEEE Transactions on Power Apparatus and Systems.
[3] Susan Finger. Modeling conventional and pumped hydro-electric energy using Booth-Baleriaux probabilistic simulation , 1975 .
[4] Paul Ferris Deaton,et al. Utility system integration and optimization models for nuclear power management , 1973 .
[5] D. S. Joy,et al. Wein Automatic System Planning Package (WASP): an electric utility optimal generation expansion planning computer code , 1974 .
[6] M. Boiteux. Peak-Load Pricing , 1960 .
[7] R. R. Booth,et al. Power System Simulation Model Based on Probability Analysis , 1972 .
[8] Susan Finger. Electric power system production costing and reliability analysis including hydroelectric, storage, and time dependent power plants , 1979 .
[9] B. Avi-Itzhak,et al. The combined load duration curve and its derivation , 1977, IEEE Transactions on Power Apparatus and Systems.
[10] Henry D. Jacoby,et al. Analysis of investment in electric power , 1967 .