Integrated cost, quality, risk and schedule control through earned value management (EVM)

The purpose of this paper is to propose an integrated earned value management (EVM) approach to control quality, cost, schedule and risk of projects.,This study represents a new EVM framework by considering a quality control index. Particularly, some control indices and cumulative buffers are defined by two proposed, methods, namely the linear- and Taguchi-based methods. These methods are implemented in three different projects in different industries.,According to the results, integration of the quality index creates a better control situation by providing more accurate information. Hence, project managers could comprehensively monitor the status of important factors to make more precise decisions while maintaining the simplicity of their analysis.,From the methodological and theoretical features, this paper offers new visions because, to the best of authors’ knowledge, no comparable study has been conducted before.

[1]  Franco Caron,et al.  A Bayesian Approach to Improve Estimate at Completion in Earned Value Management , 2013 .

[2]  Alberto De Marco,et al.  An Earned Schedule-based regression model to improve cost estimate at completion , 2014 .

[3]  Xu Kuo Gao,et al.  The Application of Improved Earned Value Model in Engineering Quality and Progress Coordination Management , 2011 .

[4]  Amir Salehipour,et al.  Evaluating fuzzy earned value indices and estimates by applying alpha cuts , 2011, Expert Syst. Appl..

[5]  José Manuel Galán,et al.  Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques , 2015 .

[6]  Bilal Ayub,et al.  Estimated Cost at Completion: Integrating Risk into Earned Value Management , 2017 .

[7]  Mario Vanhoucke,et al.  A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence , 2017, Eur. J. Oper. Res..

[8]  Homayoun Khamooshi,et al.  EDM: Earned Duration Management, a new approach to schedule performance management and measurement , 2014 .

[9]  Alberto De Marco,et al.  Earned value‐based performance monitoring of facility construction projects , 2013 .

[10]  Hans Petter Krane,et al.  A Review on Possible Approaches for Detecting Early Warning Signs in Projects , 2013 .

[11]  Abdollah Abdi,et al.  Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items , 2014 .

[12]  Raafat Elshaer,et al.  Impact of sensitivity information on the prediction of project's duration using earned schedule method , 2013 .

[13]  Louis-Philippe Kerkhove,et al.  Extensions of earned value management: Using the earned incentive metric to improve signal quality , 2017 .

[14]  Mario Vanhoucke,et al.  A comparative study of Artificial Intelligence methods for project duration forecasting , 2016, Expert Syst. Appl..

[15]  Denis F. Cioffi,et al.  Estimating a project's earned and final duration , 2016 .

[16]  Mario Vanhoucke,et al.  Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management , 2015 .

[17]  Mario Vanhoucke,et al.  A comparison of different project duration forecasting methods using earned value metrics , 2006 .

[18]  Mario Vanhoucke,et al.  A comparison of the performance of various project control methods using earned value management systems , 2015, Expert Syst. Appl..

[19]  Jiyao Xu,et al.  Project integrated management based on quality earned value , 2010, The 2nd International Conference on Information Science and Engineering.

[20]  Sijun Bai,et al.  Applied research of earned value theory in the engineering project management , 2011, 2011 2nd IEEE International Conference on Emergency Management and Management Sciences.

[21]  Sławomir Biruk,et al.  PROJECT PERFORMANCE REPORTING AND PREDICTION: EXTENSIONS OF EARNED VALUE MANAGEMENT , 2011 .

[22]  Mario Vanhoucke,et al.  Setting tolerance limits for statistical project control using earned value management , 2014 .

[23]  L. M. Naeni,et al.  A fuzzy approach for the earned value management , 2011 .

[24]  Mario Vanhoucke Measuring the efficiency of project control using fictitious and empirical project data , 2012 .

[25]  Ofer Zwikael,et al.  Prediction of project outcome The Application of statistical methods to earned value management and earned schedule performance indexes , 2009 .

[26]  John H. Sheesley,et al.  Quality Engineering in Production Systems , 1988 .

[27]  Byung-Cheol Kim,et al.  Integrating Risk Assessment and Actual Performance for Probabilistic Project Cost Forecasting: A Second Moment Bayesian Model , 2015, IEEE Transactions on Engineering Management.

[28]  Mario Vanhoucke,et al.  Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting , 2017 .

[29]  Michael R. Duffey,et al.  A model for effective implementation of Earned Value Management methodology , 2003 .

[30]  Adolfo López-Paredes,et al.  An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .

[31]  Mario Vanhoucke Dynamic scheduling: integrating schedule risk analysis with earned value management , 2012 .