Integrated cost, quality, risk and schedule control through earned value management (EVM)
暂无分享,去创建一个
Masoud Rahiminezhad Galankashi | Abbas Saghaei | Roya Soltani | Mohammad A. Khalilzadeh | Tahereh Khesal | R. Soltani | M. Khalilzadeh | A. Saghaei | Tahereh Khesal
[1] Franco Caron,et al. A Bayesian Approach to Improve Estimate at Completion in Earned Value Management , 2013 .
[2] Alberto De Marco,et al. An Earned Schedule-based regression model to improve cost estimate at completion , 2014 .
[3] Xu Kuo Gao,et al. The Application of Improved Earned Value Model in Engineering Quality and Progress Coordination Management , 2011 .
[4] Amir Salehipour,et al. Evaluating fuzzy earned value indices and estimates by applying alpha cuts , 2011, Expert Syst. Appl..
[5] José Manuel Galán,et al. Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques , 2015 .
[6] Bilal Ayub,et al. Estimated Cost at Completion: Integrating Risk into Earned Value Management , 2017 .
[7] Mario Vanhoucke,et al. A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence , 2017, Eur. J. Oper. Res..
[8] Homayoun Khamooshi,et al. EDM: Earned Duration Management, a new approach to schedule performance management and measurement , 2014 .
[9] Alberto De Marco,et al. Earned value‐based performance monitoring of facility construction projects , 2013 .
[10] Hans Petter Krane,et al. A Review on Possible Approaches for Detecting Early Warning Signs in Projects , 2013 .
[11] Abdollah Abdi,et al. Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items , 2014 .
[12] Raafat Elshaer,et al. Impact of sensitivity information on the prediction of project's duration using earned schedule method , 2013 .
[13] Louis-Philippe Kerkhove,et al. Extensions of earned value management: Using the earned incentive metric to improve signal quality , 2017 .
[14] Mario Vanhoucke,et al. A comparative study of Artificial Intelligence methods for project duration forecasting , 2016, Expert Syst. Appl..
[15] Denis F. Cioffi,et al. Estimating a project's earned and final duration , 2016 .
[16] Mario Vanhoucke,et al. Evaluation of deterministic state-of-the-art forecasting approaches for project duration based on earned value management , 2015 .
[17] Mario Vanhoucke,et al. A comparison of different project duration forecasting methods using earned value metrics , 2006 .
[18] Mario Vanhoucke,et al. A comparison of the performance of various project control methods using earned value management systems , 2015, Expert Syst. Appl..
[19] Jiyao Xu,et al. Project integrated management based on quality earned value , 2010, The 2nd International Conference on Information Science and Engineering.
[20] Sijun Bai,et al. Applied research of earned value theory in the engineering project management , 2011, 2011 2nd IEEE International Conference on Emergency Management and Management Sciences.
[21] Sławomir Biruk,et al. PROJECT PERFORMANCE REPORTING AND PREDICTION: EXTENSIONS OF EARNED VALUE MANAGEMENT , 2011 .
[22] Mario Vanhoucke,et al. Setting tolerance limits for statistical project control using earned value management , 2014 .
[23] L. M. Naeni,et al. A fuzzy approach for the earned value management , 2011 .
[24] Mario Vanhoucke. Measuring the efficiency of project control using fictitious and empirical project data , 2012 .
[25] Ofer Zwikael,et al. Prediction of project outcome The Application of statistical methods to earned value management and earned schedule performance indexes , 2009 .
[26] John H. Sheesley,et al. Quality Engineering in Production Systems , 1988 .
[27] Byung-Cheol Kim,et al. Integrating Risk Assessment and Actual Performance for Probabilistic Project Cost Forecasting: A Second Moment Bayesian Model , 2015, IEEE Transactions on Engineering Management.
[28] Mario Vanhoucke,et al. Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting , 2017 .
[29] Michael R. Duffey,et al. A model for effective implementation of Earned Value Management methodology , 2003 .
[30] Adolfo López-Paredes,et al. An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index , 2011 .
[31] Mario Vanhoucke. Dynamic scheduling: integrating schedule risk analysis with earned value management , 2012 .