Punching Process and Technical Equipment of High-Density Sub-Mesh Plate

According to the problems in the process of high-density mesh plate that mesh holes of plate is too density and the device screw bar is not long enough for the original equipment, a set process is used to overcome the problems of lying out and fixing for punchers. A simple special tool is designed. Fixed and slide ruler mechanisms are installed in the original machine. Repeat-orientation and several division methods are used, and the stroke of the original machine is increased two times, which successfully solves the processing problems and creates good economic benefits.