Optimization model for construction project resource leveling using a novel modified symbiotic organisms search
暂无分享,去创建一个
Min-Yuan Cheng | Duc-Hoc Tran | Doddy Prayogo | Daniel Tjandra | Foek Tjong Wong | M. Cheng | Duc-Hoc Tran | D. Prayogo | D. Tjandra | F. Wong
[1] Qingxian An,et al. New Approaches for Resource Allocation via DEA Models , 2012, Int. J. Inf. Technol. Decis. Mak..
[2] Aniruddha Bhattacharya,et al. Symbiotic organisms search algorithm for economic dispatch problems , 2017, 2017 Second International Conference on Electrical, Computer and Communication Technologies (ICECCT).
[3] Nhat-Duc Hoang,et al. A Novel Resource-Leveling Approach for Construction Project Based on Differential Evolution , 2014 .
[4] Min-Yuan Cheng,et al. A novel fuzzy adaptive teaching–learning-based optimization (FATLBO) for solving structural optimization problems , 2016, Engineering with Computers.
[5] Min-Yuan Cheng,et al. A novel Multiple Objective Symbiotic Organisms Search (MOSOS) for time-cost-labor utilization tradeoff problem , 2016, Knowl. Based Syst..
[6] Khaled A El-Rayes,et al. Optimizing Resource Leveling in Construction Projects , 2009 .
[7] Rainer Storn,et al. Differential Evolution – A Simple and Efficient Heuristic for global Optimization over Continuous Spaces , 1997, J. Glob. Optim..
[8] Min Yao,et al. Differential evolution with M-fitness method , 2014, Fifth International Conference on Computing, Communications and Networking Technologies (ICCCNT).
[9] Min-Yuan Cheng,et al. A Novel Implementation of Nature-inspired Optimization for Civil Engineering: A Comparative Study of Symbiotic Organisms Search , 2017 .
[10] David Arditi,et al. Selecting a delay analysis method in resolving construction claims , 2006 .
[11] Tarek Hegazy,et al. Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .
[12] Glenn A. Sears,et al. Construction project management : a practical guide to field construction management , 2008 .
[13] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[14] Sou-Sen Leu,et al. RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .
[15] M. Ilchi Ghazaan,et al. A new hybrid meta-heuristic algorithm for optimal design of large-scale dome structures , 2018 .
[16] Min-Yuan Cheng,et al. Symbiotic Organisms Search: A new metaheuristic optimization algorithm , 2014 .
[17] M. Alipour,et al. Application of CBO and CSS for Resource Allocation and Resource Leveling Problem , 2016 .
[18] Budi Santosa,et al. Symbiotic organisms search and two solution representations for solving the capacitated vehicle routing problem , 2017, Appl. Soft Comput..
[19] Rainer Storn,et al. Differential Evolution-A simple evolution strategy for fast optimization , 1997 .
[20] Samir W. Mahfoud. Niching methods for genetic algorithms , 1996 .
[21] Min-Yuan Cheng,et al. Differential Big Bang - Big Crunch algorithm for construction-engineering design optimization , 2018 .
[22] Kenneth Alan De Jong,et al. An analysis of the behavior of a class of genetic adaptive systems. , 1975 .
[23] Min-Yuan Cheng,et al. Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search , 2016, J. Comput. Civ. Eng..
[24] Fadi A. Karaa,et al. Resource Management in Construction , 1986 .
[25] James Kennedy,et al. Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.
[26] Ali Kaveh,et al. Applications of Metaheuristic Optimization Algorithms in Civil Engineering , 2016 .
[27] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[28] P. N. Suganthan,et al. Differential Evolution Algorithm With Strategy Adaptation for Global Numerical Optimization , 2009, IEEE Transactions on Evolutionary Computation.
[29] Majid Alipour,et al. Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms , 2016 .
[30] Min-Yuan Cheng,et al. Fuzzy clustering chaotic-based differential evolution for resource leveling in construction projects , 2016 .
[31] Georgios Ellinas,et al. Minimum Moment Method for Resource Leveling Using Entropy Maximization , 2010 .
[32] Ponnuthurai N. Suganthan,et al. Real-parameter evolutionary multimodal optimization - A survey of the state-of-the-art , 2011, Swarm Evol. Comput..
[33] Julio C. Martinez,et al. Resource Leveling Based on the Modified Minimum Moment Heuristic , 1993 .
[34] Min-Yuan Cheng,et al. A Hybrid Harmony Search algorithm for discrete sizing optimization of truss structure , 2016 .
[35] Robert B. Harris. Packing Method for Resource Leveling (PACK) , 1990 .
[36] Said M. Easa,et al. Resource Leveling in Construction by Optimization , 1989 .
[37] Maged Georgy,et al. Evolutionary resource scheduler for linear projects , 2008 .
[38] Miroslaw J. Skibniewski,et al. Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach , 1999 .
[39] Min-Yuan Cheng,et al. SOS optimization model for bridge life cycle risk evaluation and maintenance strategies , 2014 .
[40] Jin-qiang Geng,et al. An improved ant colony optimization algorithm for nonlinear resource-leveling problems , 2011, Comput. Math. Appl..
[41] Wenjian Luo,et al. Differential evolution with dynamic stochastic selection for constrained optimization , 2008, Inf. Sci..
[42] Ali Kaveh,et al. ENGINEERING DESIGN OPTIMIZATION USING A HYBRID PSO AND HS ALGORITHM , 2013 .
[43] Min-Yuan Cheng,et al. Predicting productivity loss caused by change orders using the evolutionary fuzzy support vector machine inference model , 2015 .