Failure mechanism of tunnel lining joints and bolts with uneven longitudinal ground settlement
暂无分享,去创建一个
Zhan Wang | Lingling Li | Lizhong Wang | Jingchang Wang | Ling-ling Li | Jingchang Wang | Lizhong Wang | Zhan Wang
[1] C.B.M. Blom,et al. Three-dimensional structural analyses of the shield-driven “Green Heart” tunnel of the high-speed line South , 1999 .
[2] Hongwei Huang,et al. The longitudinal model test of shield tunnel , 2006 .
[3] Atsushi Koizumi,et al. IN-SITU TESTS AND CONSIDERATION ON SHIELD TUNNEL IN THE LONGITUDINAL DIRECTION , 1986 .
[4] J. Drife,et al. The third edition , 2014 .
[5] Chuan He,et al. A study on longitudinal deformation characteristics of super long shield tunnel based on 3D elastic foundation model , 2009 .
[6] C.B.M. Blom,et al. Design philosophy of concrete linings for tunnels in soft soils , 2002 .
[7] Kazuhiko Kawashima,et al. EVALUATION PROCEDURE FOR SEISMIC STRESS DEVELOPED IN SHIELD TUNNELS BASED ON SEISMIC DEFORMATION METHOD , 1989 .
[8] Jun Sheng Chen,et al. Study on inner force and dislocation of segments caused by shield machine attitude , 2008 .
[9] Robert J. Mair,et al. Long-term settlements over tunnels: an eleven-year study at Grimsby , 1991 .
[10] Kazuhiko Kawashima,et al. AN EVALUATION METHOD OF LONGITUDINAL STIFFNESS OF SHIELD TUNNEL LININGS FOR APPLICATION TO SEISMIC RESPONSE ANALYSES , 1988 .
[11] Hehua Zhu,et al. Analysis of shield tunnel , 2004 .
[12] S. Shen,et al. Analysis of shearing effect on tunnel induced by load transfer along longitudinal direction , 2008 .
[13] Zhan Wang,et al. Construction behavior simulation of a hydraulic tunnel during standpipe lifting , 2011 .