A suggested framework for product life cycle cost analysis at product design stage

This paper provides a framework for life cycle cost analysis of products at the design stage based on reliability and maintainability parameters. When dealing with reliability field data, proper selection of models for time-to-failure data is essential as it affects the expected number of failures. The conventional time-to-failure analysis techniques rely on the major assumption of independent and identically distributed time between failures which is, in fact, not appropriate for all systems. This can lead to erroneous model selection for time-to-failure of a system leading to erroneous estimates of life cycle costs. To overcome this, a framework directed towards proper selection of time-to-failure model and a procedure for life cycle cost analysis is presented. The application of the proposed methodology is illustrated with two case studies by comparing the costs predicted by the proposed model with the costs that are actually experienced. It is found that the model correctly predicts each product’s lif...

[1]  M.W. Cardullo,et al.  Total life-cycle cost analysis of conventional and alternative fueled vehicles , 1993, IEEE Aerospace and Electronic Systems Magazine.

[2]  Nazim U. Ahmed,et al.  A design and implementation model for life cycle cost management system , 1995, Inf. Manag..

[3]  Walter Wong,et al.  Life cycle cost modelling using marked point processes , 1998 .

[4]  L. Y. Waghmode,et al.  An Application of a Generalized Life Cycle Cost Model to a Typical Pump From Industry , 2009 .

[5]  E. E. Curry FALCCM-H: Functional Avionics Life Cycle Cost Model for Hardware , 1993, Proceedings of the IEEE 1993 National Aerospace and Electronics Conference-NAECON 1993.

[6]  D. Karlsson,et al.  Reliability and life cycle cost estimates of 400 kV substation layouts , 1997 .

[7]  H. B. Mann Nonparametric Tests Against Trend , 1945 .

[8]  Yasushi Kondo,et al.  Hybrid LCC of Appliances with Different Energy Efficiency (10 pp) , 2006 .

[9]  Kosuke Ishii,et al.  Life-Cycle Engineering Design , 1995 .

[10]  Andrew K. S. Jardine,et al.  A practical procedure for the selection of time-to-failure models based on the assessment of trends in maintenance data , 2009, Reliab. Eng. Syst. Saf..

[11]  J. L. Warren,et al.  Development of an integrated life-cycle cost assessment model , 1994, Proceedings of 1994 IEEE International Symposium on Electronics and The Environment.

[12]  Harold E. Ascher,et al.  Repairable Systems Reliability: Modelling, Inference, Misconceptions and Their Causes , 1984 .

[13]  L. Bertling,et al.  Maintenance Management of Wind Power Systems Using Condition Monitoring Systems—Life Cycle Cost Analysis for Two Case Studies , 2007, IEEE Transactions on Energy Conversion.

[14]  Xun Xu,et al.  Framework of a Product Lifecycle Costing System , 2006, J. Comput. Inf. Sci. Eng..

[15]  Heung-Suk Hwang,et al.  Costing RAM design and test analysis model for production facility , 2005 .

[16]  Shad Dowlatshahi,et al.  Product design in a concurrent engineering environment : an optimization approach , 1992 .

[17]  Jeffrey Alun Jones,et al.  A framework for documenting and analyzing life-cycle costs using a simple network based representation , 2003, Annual Reliability and Maintainability Symposium, 2003..

[18]  H. M. Snyder Life cycle cost model for dormant systems , 1990, IEEE Conference on Aerospace and Electronics.

[19]  Harold E. Ascher Repairable Systems Reliability , 2008 .

[20]  Karlos Artto,et al.  Life cycle cost concepts and methodologies , 1994 .

[21]  Emmanuel Benard,et al.  A generic tool for cost estimating in aircraft design , 2004 .

[22]  Y. Asiedu,et al.  Product life cycle cost analysis: State of the art review , 1998 .

[23]  Balbir S. Dhillon Life Cycle Costing: Techniques, Models and Applications , 1989 .

[24]  J.H. Kim,et al.  Life cycle cost modeling for railway vehicle , 2007, 2007 International Conference on Electrical Machines and Systems (ICEMS).

[25]  Peter A. W. Lewis,et al.  Testing for a monotone trend in a modulated renewal process , 1973 .

[26]  Andre Kleyner,et al.  Minimizing life cycle cost by managing product reliability via validation plan and warranty return cost , 2008 .