Comparison of conventional and dynamic FMS periodic loading rules

Reports on a comparison by computer simulation between conventional periodic loading (PL) and job‐group loading (JGL). When conventional PL is used, the search of the best part input sequence must be performed in order to optimize performance of a flexible manufacturing system (FMS). JGL works, instead, as a dynamic rule for real time scheduling of FMS, defining a part releasing policy able to guarantee the reaching of a periodic steady state without non‐productive times on the bottleneck workstation. However, JGL does not assure, in some cases, the same performance arising from the optimal part input sequence of conventional PL, in terms of non‐productive times in FMS filling and emptying phases, work in progress and throughput time. The paper demonstrates that using any JGL rule or the best PL part input sequence gives rise to negligible differences in FMS performance. Furthermore, the dynamic capabilities of the JGL also allow for spontaneously restoring the FMS periodic steady state without non‐productive times after any transient, for instance when production mix changes occur.

[1]  Moshe M. Barash,et al.  Operational control of item flow in versatile manufacturing systems , 1979 .

[2]  Kathryn E. Stecke,et al.  On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems , 1996 .

[3]  J. Erschler,et al.  Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints , 1985 .

[4]  P. M. Pelagagge,et al.  On the capability of job-group loading in FMS management , 1993, ISIE '93 - Budapest: IEEE International Symposium on Industrial Electronics Conference Proceedings.

[5]  Pacifico M. Pelagagge,et al.  An effective loading rule for FMS real time scheduling , 1996 .

[6]  Ram Rachamadugu,et al.  Classification and review of FMS scheduling procedures , 1994 .

[7]  Robert J. Wittrock,et al.  Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..

[8]  Robert M. O'Keefe,et al.  Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base , 1992 .

[9]  Marco Garetti,et al.  On-line loading and dispatching in flexible manufacturing systems , 1990 .

[10]  Kathryn E. Stecke,et al.  Loading and control policies for a flexible manufacturing system , 1981 .

[11]  David R. Denzler,et al.  Experimental investigation of flexible manufacturing system scheduling decision rules , 1987 .

[12]  K. L. Hitz Scheduling of flexible flowshops , 1979 .

[13]  Stanley B. Gershwin,et al.  Real-time production scheduling of an automated cardline , 1985 .

[14]  Kathryn E. Stecke,et al.  A flexible approach to part type selection in flexible flow systems using part mix ratios , 1991 .