A decision support system of real time dispatching in semiconductor wafer fabrication with shortest process time in wet bench

This paper will propose a new dynamic dispatching algorithm for determining the priority of lots, which are waiting to be processed in wet bench. In MXIC, we have successfully implemented a Real Time Dispatcher (RTD) consisting of our MES (since 1998), which could pass the real time information to on-line operators. However, we didn't have a proper and good dispatching rule for wet bench since then. We always relied on the veterans' experience to arrange all the lots run through wet etch. It's hard to exactly control when and how much lots would come out from wet bench in order to meet the production of furnaces that we want. After applying the new dispatching algorithm in FAB, we found that it turned up the good results of reducing the differences between the seniors' and juniors' experience and minimizing the needed time of the specific lots.

[1]  S. Arima,et al.  A simulation study on periodical priority dispatching of WIP for product-mix fabrication , 2002, 13th Annual IEEE/SEMI Advanced Semiconductor Manufacturing Conference. Advancing the Science and Technology of Semiconductor Manufacturing. ASMC 2002 (Cat. No.02CH37259).

[2]  J. Domaschke,et al.  Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations , 2000 .

[3]  G. Winz,et al.  Improvement of production logistics for backend manufacturing , 1999, 1999 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat No.99CH36314).