T𝕙roughput Rate Maximization In Flexible Manufacturing Cells
暂无分享,去创建一个
[1] R. Suri,et al. Time-optimal control of parts-routing in a manufacturing system with failure-prone machines , 1980, 1980 19th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.
[2] Stephen C. Graves,et al. Scheduling of re-entrant flow shops , 1983 .
[3] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[4] Robert J. Wittrock,et al. Scheduling Algorithms for Flexible Flow Lines , 1985, IBM J. Res. Dev..
[5] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .
[6] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..