IMPLEMENTATION OF CONCRETE MATURITY METERS

[1]  A. G. Timms,et al.  Temperature Effects On Compressive Strength Of Concrete , 1934 .

[2]  J. D. McIntosh,et al.  Electrical curing of concrete , 1949 .

[3]  Walter H. Price,et al.  Factors influencing concrete strength , 1950, Materiales de Construcción.

[4]  A. G. A. Saul,et al.  Principles underlying the steam curing of concrete at atmospheric pressure , 1951 .

[5]  Sven G. Bergström,et al.  Curing temperature, age and strength of concrete , 1953 .

[6]  E. Rastrup,et al.  Heat of hydration in concrete , 1954 .

[7]  J. M. Plowman Maturity and the strength of concrete , 1956 .

[8]  Paul Klieger,et al.  Effect of Mixing and Curing Temperature onConcrete Strength , 1958 .

[9]  Chin Fung Kee,et al.  Relation Between Strength and Maturity of Concrete , 1971 .

[10]  Nicholas J. Carino,et al.  Early Age Temperature Effects on Concrete Strength Predictionby the Maturity Method , 1983 .

[11]  Nicholas J. Carino,et al.  Temperature Effects on Strength-Maturity Relations of Mortar , 1983 .

[12]  Nicholas J. Carino,et al.  The Maturity Method: Theory and Application , 1984 .

[13]  V. M. Malhotra,et al.  CRC Handbook on Nondestructive Testing of Concrete , 1990 .

[14]  Nicholas J. Carino,et al.  Maturity Function for Concretes Made With Various Cements and Admixtures , 1992 .

[15]  Farhad Ansari,et al.  DEVELOPING FAST TRACK CONCRETE FOR PAVEMENT REPAIR , 1997 .

[16]  Ali Maher,et al.  Development of Maturity Protocol for Construction of NJDOT Concrete Structures , 1999 .

[17]  David G Tepke,et al.  Using the concrete maturity meter for QA/QC; executive summary , 2001 .

[18]  Farhad Ansari,et al.  Use of the maturity method during highway bridge construction , 2002 .

[19]  Nicholas J. Carino,et al.  The Maturity Method , 2003 .

[20]  Nicholas J. Carino,et al.  228.1R-03 In-Place Methods to Estimate Concrete Strength , 2003 .