Optimum operation control for multiple machining projects under fixed production interval
暂无分享,去创建一个
[1] A. N. Mustafizul Karim,et al. Selection of cemented carbide turning tools using EMF and optimization criteria , 1998 .
[2] Nivaldo Lemos Coppini,et al. Cost per piece determination in machining process: An alternative approach , 1996 .
[3] Tian-Syung Lan,et al. The optimal control of material removal rate with fixed tool life and speed limitation , 2002 .
[4] Giacomo Maria Galante,et al. Tool-life modelling as a stochastic process , 1998 .
[5] H. M. Soroush,et al. Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs , 1999, Eur. J. Oper. Res..
[6] Brian G. Kingsman,et al. Responding to customer enquiries in Make-to-Order companies: problems and solutions , 1996 .
[7] Peter B. Luh,et al. Scheduling of a machining center , 1996 .
[8] Tae-Yong Kim,et al. Adaptive cutting force control for a machining center by using indirect cutting force measurements , 1996 .
[9] Yih-Fang Chang,et al. Design and implementation for maximum metal removal-rate control of a constant turning-force system , 1996 .
[10] Tian-Syung Lan,et al. DYNAMIC MACHINING PROJECT CONTROL MODEL UNDER ORDER QUANTITY AND DEADLINE CONSTRAINTS , 2002 .
[11] Gur Mosheiov,et al. A common due-date assignment problem on parallel identical machines , 2001, Comput. Oper. Res..
[12] Yung C. Shin,et al. Modeling and control of cnc machines using a PC-based open architecture controller , 1995 .
[13] Jong-Yun Jung,et al. Feature-based noncutting tool path selection , 1994 .