Scheduling in iron ore open-pit mining
暂无分享,去创建一个
[1] Rajive Ganguli,et al. A genetic algorithms approach for grade control planning in a bauxite deposit , 2005 .
[2] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[3] Behrooz Karimi,et al. Long-term open pit mine production planning: a review of models and algorithms , 2008 .
[4] Eduardo Moreno,et al. A New Algorithm for the Open-Pit Mine Production Scheduling Problem , 2012, Oper. Res..
[5] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[6] A. Mehrez,et al. A Production Problem in Phosphate Mining , 1985 .
[7] Natashia Boland,et al. A strengthened formulation and cutting planes for the open pit mine production scheduling problem , 2010, Comput. Oper. Res..
[8] T. Yamada,et al. Solving the C/sub sum/ permutation flowshop scheduling problem by genetic local search , 1998, 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360).
[9] Elena Marchiori,et al. An Evolutionary Algorithm for Large Scale Set Covering Problems with Application to Airline Crew Scheduling , 2000, EvoWorkshops.
[10] Tapabrata Ray,et al. Optimum Oil Production Planning using an Evolutionary Approach , 2007, Evolutionary Scheduling.
[11] Jean-Michel Rendu. Geostatistical Simulations for Risk Assessment and Decision Making: The Mining Industry Perspective , 2002 .
[12] Erik Ostermann. How To Solve It Modern Heuristics , 2016 .
[13] Margaret Armstrong,et al. New approach to flexible open pit optimisation and scheduling , 2012 .
[14] Ling Wang,et al. A Modified Genetic Algorithm for Job Shop Scheduling , 2002 .
[15] Lou Caccetta,et al. An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..
[16] Javad Sattarvand,et al. A New Metaheuristic Algorithm for Long-Term Open-Pit Production Planning / Nowy meta-heurystyczny algorytm wspomagający długoterminowe planowanie produkcji w kopalni odkrywkowej , 2013 .
[17] T. J. O'Neil,et al. Application of Computers and Operations Research in the Mineral Industry , 1979 .
[18] S. G. Ponnambalam,et al. A GA-SA Multiobjective Hybrid Search Algorithm for Integrating Lot Sizing and Sequencing in Flow-Line Scheduling , 2003 .
[19] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[20] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms—I: representation , 1996 .
[21] Martin L. Smith,et al. Mine production scheduling for optimization of plant recovery in surface phosphate operations , 1995 .
[22] N. V. Astashkin. Scheduling of mining operations , 1972 .
[23] E. Nowicki,et al. A fast tabu search algorithm for the permutation flow-shop problem , 1996 .
[24] Jan Karel Lenstra,et al. Job Shop Scheduling by Simulated Annealing , 1992, Oper. Res..
[25] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[26] Kazuhiro Kawahata. New algorithm to solve large scale mine production scheduling problems by using the Lagrangian relaxation method, A , 2016 .
[27] D. Lambert,et al. SUPPLY CHAIN MANAGEMENT , 2003 .
[28] Edmund K. Burke,et al. A memetic algorithm to schedule planned maintenance for the national grid , 1999, JEAL.