Successful implementation of an order release mechanism based on workload control: a case study of a make-to-stock manufacturer
暂无分享,去创建一个
Stefan Haeussler | Hubert Missbauer | Thomas Hutter | Thomas Hütter | H. Missbauer | Stefan Haeussler
[1] Matthias Thürer,et al. On the integration of input and output control : Workload Control order release , 2016 .
[2] Jwm Will Bertrand,et al. Production Control: A Structural and Design Oriented Approach , 1990 .
[3] Cristovao Silva,et al. Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders , 2013 .
[4] W. Pasmore,et al. The Promise of Collaborative Management Research , 2008 .
[5] Reha Uzsoy,et al. Production planning with resources subject to congestion , 2009 .
[6] Jan Fransoo,et al. Planning Supply Chain Operations: Definition and Comparison of Planning Concepts , 2003, Supply Chain Management.
[7] Ronald Maier,et al. Implementing process-oriented knowledge management strategies , 2003, J. Knowl. Manag..
[8] Hermann Lödding. Verfahren der Fertigungssteuerung , 2016 .
[9] B. Kingsman,et al. Production planning systems and their applicability to make-to-order companies , 1989 .
[10] Roberto Cigolini,et al. Order review and release strategies ina job shop environment: A review and a classification , 1997 .
[11] Cristovao Silva,et al. The application of workload control in assembly job shops: an assessment by simulation , 2012 .
[12] William Samuelson,et al. Status quo bias in decision making , 1988 .
[13] Wolfgang Bechte. Load-oriented manufacturing control just-in-time production for job shops , 1994 .
[14] Gerard Gaalman,et al. Workload control dynamics in practice , 2012 .
[15] Susan Albers Mohrman,et al. Handbook of Collaborative Management Research , 2008 .
[16] Mark Stevenson,et al. Workload control: Successful implementation taking a contingency‐based view of production planning and control , 2013 .
[17] L. Hendrya,et al. Investigating implementation issues for workload control ( WLC ) : A comparative case study analysis , 2008 .
[18] Martin Land,et al. Improving a practical DBR buffering approach using Workload Control , 2003 .
[19] Hans-Peter Wiendahl,et al. Application of load-oriented manufacturing control in industry , 1992 .
[20] Cristovao Silva,et al. A case study of the successful implementation of workload control : A practitioner-led approach , 2015 .
[21] Michael P. Wellman,et al. Planning and Control , 1991 .
[22] Mark Stevenson,et al. The theory and practice of workload control: A research agenda and implementation strategy , 2011 .
[23] Steven A. Melnyk,et al. The scientific theory‐building process: a primer using the case of TQM , 1998 .
[24] Cristovao Silva,et al. Theoretical development of a workload control methodology: evidence from two case studies , 2008 .
[25] Linda Hendry,et al. Production planning for an artists studio -- A case study , 1993 .
[26] Cristovao Silva,et al. Three decades of workload control research: a systematic review of the literature , 2011 .
[27] Marco Tantardini,et al. A lean-based ORR system for non-repetitive manufacturing , 2012 .
[28] G. Zäpfel,et al. New concepts for production planning and control , 1993 .
[29] Hartmut Stadtler,et al. Supply Chain Management and Advanced Planning: Concepts, Models, Software, and Case Studies , 2010 .
[30] Sanjay Bhasin,et al. Lean viewed as a philosophy , 2006 .
[31] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[32] Brian G. Kingsman,et al. The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies , 2002 .
[33] Christine Nadel,et al. Case Study Research Design And Methods , 2016 .
[34] J. Little. A Proof for the Queuing Formula: L = λW , 1961 .
[35] Jana Fuhrmann. The Essentials Of Project Management , 2016 .
[36] Nuno O. Fernandes,et al. Workload control in unbalanced job shops , 2014 .
[37] Mark Stevenson. Refining a Workload Control (WLC) concept: a case study , 2006 .
[38] Matthias Thürer,et al. Job sequencing and selection within workload control order release: an assessment by simulation , 2016 .
[39] Hans-Peter Wiendahl,et al. Load-Oriented Manufacturing Control , 1994 .
[40] Cristovao Silva,et al. Workload control release mechanisms: from practice back to theory building , 2010 .
[41] Roberto Cigolini,et al. Comparison of Order Review and Release techniques in a dynamic and uncertain job shop environment , 1998 .
[42] Timothy D. Fry,et al. IMPLEMENTING DRUM-BUFFER-ROPE TO CONTROL MANUFACTURING LEAD TIME. , 1991 .
[43] Mark Stevenson,et al. Aggregate load-oriented workload control: A review and a re-classification of a key approach , 2006 .
[44] Steven A. Melnyk,et al. Order review/release: research issues and perspectives , 1989 .
[45] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[46] Paul M. Bobrowski. Implementing a loading heuristic in a discrete release job shop , 1989 .
[47] Cristóvão Silva,et al. MAPP - A web-based decision support system for the mould industry , 2006, Decis. Support Syst..
[48] Hubert Missbauer,et al. Developing a Computerized Scheduling System for the Steelmaking–Continuous Casting Process , 2011 .
[49] P. Henrich,et al. Applicability aspects of workload control in job shop production , 2005 .
[50] G. Gaalman,et al. The influence of shop characteristics on workload control , 2000 .
[51] Mark Stevenson,et al. A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .
[52] R. Cigolini,et al. An experimental investigation on workload limiting methods within ORR policies in a job shop environment , 2002 .
[53] Gerard Gaalman,et al. Exploring applicability of the workload control concept , 2004 .
[54] Jung-Su Song,et al. Delivery Date Decision Support System for the Large Scale Make-to-Order Manufacturing Companies: An Electric Motor Company Case , 1998 .