Successful implementation of an order release mechanism based on workload control: a case study of a make-to-stock manufacturer

This paper deals with improving the lead-time performance of a large crystal manufacturer that uses a state-of-the-art commercial Enterprise Resource Planning system. Since the company encountered some limitations of the standard production planning and control (PPC) system it sought for improvements by implementing an order release mechanism based on workload control (WLC). WLC employs certain rules for releasing orders in order to maintain a certain level of work in process to achieve a certain utilisation of the production system and thus control the flow times in order to meet the required due dates of the orders. We describe the successful implementation of an order release mechanism based on the WLC concept in this make-to-stock company. The paper describes the implemented order release mechanism, the implementation process and its impact on the company’s performance. We show that the core function of WLC – the order release mechanism – can be integrated successfully into an existing PPC system. Furthermore, this study highlights the applicability of WLC to a wider range of companies, especially to make-to-stock manufacturers.

[1]  Matthias Thürer,et al.  On the integration of input and output control : Workload Control order release , 2016 .

[2]  Jwm Will Bertrand,et al.  Production Control: A Structural and Design Oriented Approach , 1990 .

[3]  Cristovao Silva,et al.  Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders , 2013 .

[4]  W. Pasmore,et al.  The Promise of Collaborative Management Research , 2008 .

[5]  Reha Uzsoy,et al.  Production planning with resources subject to congestion , 2009 .

[6]  Jan Fransoo,et al.  Planning Supply Chain Operations: Definition and Comparison of Planning Concepts , 2003, Supply Chain Management.

[7]  Ronald Maier,et al.  Implementing process-oriented knowledge management strategies , 2003, J. Knowl. Manag..

[8]  Hermann Lödding Verfahren der Fertigungssteuerung , 2016 .

[9]  B. Kingsman,et al.  Production planning systems and their applicability to make-to-order companies , 1989 .

[10]  Roberto Cigolini,et al.  Order review and release strategies ina job shop environment: A review and a classification , 1997 .

[11]  Cristovao Silva,et al.  The application of workload control in assembly job shops: an assessment by simulation , 2012 .

[12]  William Samuelson,et al.  Status quo bias in decision making , 1988 .

[13]  Wolfgang Bechte Load-oriented manufacturing control just-in-time production for job shops , 1994 .

[14]  Gerard Gaalman,et al.  Workload control dynamics in practice , 2012 .

[15]  Susan Albers Mohrman,et al.  Handbook of Collaborative Management Research , 2008 .

[16]  Mark Stevenson,et al.  Workload control: Successful implementation taking a contingency‐based view of production planning and control , 2013 .

[17]  L. Hendrya,et al.  Investigating implementation issues for workload control ( WLC ) : A comparative case study analysis , 2008 .

[18]  Martin Land,et al.  Improving a practical DBR buffering approach using Workload Control , 2003 .

[19]  Hans-Peter Wiendahl,et al.  Application of load-oriented manufacturing control in industry , 1992 .

[20]  Cristovao Silva,et al.  A case study of the successful implementation of workload control : A practitioner-led approach , 2015 .

[21]  Michael P. Wellman,et al.  Planning and Control , 1991 .

[22]  Mark Stevenson,et al.  The theory and practice of workload control: A research agenda and implementation strategy , 2011 .

[23]  Steven A. Melnyk,et al.  The scientific theory‐building process: a primer using the case of TQM , 1998 .

[24]  Cristovao Silva,et al.  Theoretical development of a workload control methodology: evidence from two case studies , 2008 .

[25]  Linda Hendry,et al.  Production planning for an artists studio -- A case study , 1993 .

[26]  Cristovao Silva,et al.  Three decades of workload control research: a systematic review of the literature , 2011 .

[27]  Marco Tantardini,et al.  A lean-based ORR system for non-repetitive manufacturing , 2012 .

[28]  G. Zäpfel,et al.  New concepts for production planning and control , 1993 .

[29]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning: Concepts, Models, Software, and Case Studies , 2010 .

[30]  Sanjay Bhasin,et al.  Lean viewed as a philosophy , 2006 .

[31]  Jwm Will Bertrand,et al.  Production control and information systems for component-manufacturing shops , 1981 .

[32]  Brian G. Kingsman,et al.  The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies , 2002 .

[33]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[34]  J. Little A Proof for the Queuing Formula: L = λW , 1961 .

[35]  Jana Fuhrmann The Essentials Of Project Management , 2016 .

[36]  Nuno O. Fernandes,et al.  Workload control in unbalanced job shops , 2014 .

[37]  Mark Stevenson Refining a Workload Control (WLC) concept: a case study , 2006 .

[38]  Matthias Thürer,et al.  Job sequencing and selection within workload control order release: an assessment by simulation , 2016 .

[39]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[40]  Cristovao Silva,et al.  Workload control release mechanisms: from practice back to theory building , 2010 .

[41]  Roberto Cigolini,et al.  Comparison of Order Review and Release techniques in a dynamic and uncertain job shop environment , 1998 .

[42]  Timothy D. Fry,et al.  IMPLEMENTING DRUM-BUFFER-ROPE TO CONTROL MANUFACTURING LEAD TIME. , 1991 .

[43]  Mark Stevenson,et al.  Aggregate load-oriented workload control: A review and a re-classification of a key approach , 2006 .

[44]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[45]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[46]  Paul M. Bobrowski Implementing a loading heuristic in a discrete release job shop , 1989 .

[47]  Cristóvão Silva,et al.  MAPP - A web-based decision support system for the mould industry , 2006, Decis. Support Syst..

[48]  Hubert Missbauer,et al.  Developing a Computerized Scheduling System for the Steelmaking–Continuous Casting Process , 2011 .

[49]  P. Henrich,et al.  Applicability aspects of workload control in job shop production , 2005 .

[50]  G. Gaalman,et al.  The influence of shop characteristics on workload control , 2000 .

[51]  Mark Stevenson,et al.  A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .

[52]  R. Cigolini,et al.  An experimental investigation on workload limiting methods within ORR policies in a job shop environment , 2002 .

[53]  Gerard Gaalman,et al.  Exploring applicability of the workload control concept , 2004 .

[54]  Jung-Su Song,et al.  Delivery Date Decision Support System for the Large Scale Make-to-Order Manufacturing Companies: An Electric Motor Company Case , 1998 .