The role of integrated modeling in the design and verification of the James Webb Space Telescope
暂无分享,去创建一个
Joseph M. Howard | John D. Johnston | Kevin Kim | Gary E. Mosier | Kong Q. Ha | Mark A. McGinnis | Keith A. Parrish | T. T. Hyde | A. M. Bluth
[1] David C. Redding,et al. Fine pointing control for a Next-Generation Space Telescope , 1998, Astronomical Telescopes and Instrumentation.
[2] Ray Lundquist,et al. James Webb Space Telescope (JWST) Observatory architecture and performance , 2004, SPIE Astronomical Telescopes + Instrumentation.
[3] Keith Parrish,et al. Integrated modeling activities for the James Webb Space Telescope: structural-thermal-optical analysis , 2004, SPIE Astronomical Telescopes + Instrumentation.
[4] Joseph M. Howard. Optical modeling activities for the James Webb Space Telescope (JWST) project: I. The linear optical model , 2004, SPIE Optics + Photonics.
[5] Joseph M. Howard,et al. Integrated modeling activities for the James Webb Space Telescope: optical jitter analysis , 2004, SPIE Astronomical Telescopes + Instrumentation.
[6] John B. Shoven,et al. I , Edinburgh Medical and Surgical Journal.
[7] Gary Mosier,et al. NGST Monograph No . 6 Performance Analysis Using Integrated Modeling , 2000 .
[8] David C. Redding,et al. Integrated modeling environment for systems-level performance analysis of the Next-Generation Space Telescope , 1998, Astronomical Telescopes and Instrumentation.