EMC System Guidelines for New Buildings
暂无分享,去创建一个
EMC systems should be specified for all new projects which have:
1.
More than 8,000 square feet of conditioned (heated and/or cooled) space,
2.
more than 10,000 square feet of space which is heated only,
3.
20 or more tons of cooling with compressors of 5-ton capacity (or more) each,
4.
heating capacity in excess of 500,000 Btu/hour,
5.
a need for sophisticated control of HVAC, cogeneration, or other building systems,
6.
a need for remote communications to ensure building performance and efficiency, or
7.
a need for enhanced control, information management or system integration functions.