Literature review of material flow control mechanisms

Abstract We review mechanisms which control the flow or material into and within a manufacturing line. These material flow control (MFC) mechanisms address the problem of when to release material into a manufacturing line and when workcentres should be authorized to produce. The MFC mechanisms reviewed include: Kanban, CONWIP, workload regulating, starvation avoidance, BORA, maximum load limit, MRP, the base stock system, workload control, and production authorization cards.

[1]  Jwm Will Bertrand,et al.  Production and inventory control with the base stock system , 1984 .

[2]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[3]  Zvi Drezner,et al.  Control limits for a drifting process with quadratic loss , 1989 .

[4]  P. J. O'Grady,et al.  An adaptive approach to shop loading , 1987 .

[5]  U. Karmarkar Getting control of just-in-time. , 1989, Harvard business review.

[6]  P. M. Bobrowski,et al.  Work release strategies in a dual resource constrained job shop , 1989 .

[7]  Kut C. So,et al.  Allocating buffer storages in a pull system , 1988 .

[8]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[9]  A. Kan Machine Scheduling Problems: Classification, Complexity and Computations , 1976 .

[10]  Dinah W. Cheng,et al.  Tandem queues with general blocking: A unified model and comparison results , 1993, Discret. Event Dyn. Syst..

[11]  Kenneth R. Baker,et al.  The effects of input control in a simple scheduling model , 1984 .

[12]  Karel V. Donselaar Alternatives for MRP , 1991 .

[13]  Michael A. Zazanis,et al.  Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..

[14]  Hubert Missbauer,et al.  Production Planning and Control (PPC) systems including load-oriented order release — Problems and research perspectives , 1993 .

[15]  Gerhard Knolmayer,et al.  A Widely Acclaimed Method of Load-Oriented Job Release and its Conceptual Deficiencies , 1991 .

[16]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[17]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[18]  Jwm Will Bertrand,et al.  The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .

[19]  Upendra Dave,et al.  Heuristic Scheduling Systems , 1993 .

[20]  B. J. Berkley,et al.  Tandem queues and kanban-controlled lines , 1991 .

[21]  Thom J. Hodgson,et al.  Optimal hybrid push/pull control strategies for a parallel multistage system: Part II , 1991 .

[22]  Marc Lambrecht,et al.  Buffer Stock Allocation in Serial and Assembly Type of Production Lines , 1990 .

[23]  van Kh Karel Donselaar,et al.  The use of MRP and LRP in a stochastic environment , 1992 .

[24]  Marc Lambrecht,et al.  JIT and constraint theory: the issue of bottleneck management , 1988 .

[25]  M. Koster,et al.  Approximation of Flow Lines with Integrally Controlled Buffers , 1988 .

[26]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[27]  Hans-Peter Wiendahl,et al.  Application of load-oriented manufacturing control in industry , 1992 .

[28]  Jeff Cox,et al.  The Goal: A Process of Ongoing Improvement , 1984 .

[29]  Mauricio G. C. Resende,et al.  A scheduling rule for job release in semiconductor fabrication , 1988 .

[30]  John B. Jensen,et al.  An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .

[31]  Warren W. Fisher,et al.  Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .

[32]  R. A. Dudek,et al.  A categorized survey of the JIT literature , 1991 .

[33]  John Harhen,et al.  Mrp/mrp Ii , 1988, Computer-Aided Production Management.

[34]  Jwm Will Bertrand,et al.  Production control and information systems for component-manufacturing shops , 1981 .

[35]  de Mbm René Koster,et al.  Capacity Oriented Analysis and Design of Production Systems , 1989 .

[36]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[37]  J. A. Buzacott,et al.  Queueing models of Kanban and MRP controlled production systems , 1989 .

[38]  Debasis Mitra,et al.  Analysis of a Kanban discipline for cell coordination in production lines , 1990 .

[39]  Peter O'Grady,et al.  INTEGRATING KANBAN TYPE PULL SYSTEMS AND MRP TYPE PUSH SYSTEMS: INSIGHTS FROM A MARKOVIAN MODEL , 1992 .

[40]  Yves Dallery,et al.  A unified modeling of Kanban systems using petri nets , 1991 .

[41]  David J. Miller,et al.  Simulation of a semiconductor manufacturing line , 1990, CACM.

[42]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[43]  G. Rand Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .

[44]  Lawrence D. Fredendall,et al.  Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .

[45]  G. Zäpfel,et al.  New concepts for production planning and control , 1993 .

[46]  J. Wijngaard,et al.  Local and Integral Control of Workload , 1989 .

[47]  Fong-Yuen Ding,et al.  A modified MRP for a production system with the coexistence of MRP and kanbans , 1991 .

[48]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[49]  J. A. Buzacott,et al.  Modelling Flexible Manufacturing Systems , 1989 .

[50]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[51]  H. Wiendahl Die belastungsorientierte Fertigungssteuerung , 1992 .

[52]  Kut C. So,et al.  The impact of buffering strategies on the performance of production line systems , 1990 .

[53]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .