Literature review of material flow control mechanisms
暂无分享,去创建一个
R. John Milne | Robert J. Graves | John M. Konopka | R. Graves | J. Konopka | R. Milne | ROBERT J. Graves | JOHN M. Konopka | R. J. Milne
[1] Jwm Will Bertrand,et al. Production and inventory control with the base stock system , 1984 .
[2] Mauricio G. C. Resende,et al. Closed-loop job release control for VLSI circuit manufacturing , 1988 .
[3] Zvi Drezner,et al. Control limits for a drifting process with quadratic loss , 1989 .
[4] P. J. O'Grady,et al. An adaptive approach to shop loading , 1987 .
[5] U. Karmarkar. Getting control of just-in-time. , 1989, Harvard business review.
[6] P. M. Bobrowski,et al. Work release strategies in a dual resource constrained job shop , 1989 .
[7] Kut C. So,et al. Allocating buffer storages in a pull system , 1988 .
[8] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[9] A. Kan. Machine Scheduling Problems: Classification, Complexity and Computations , 1976 .
[10] Dinah W. Cheng,et al. Tandem queues with general blocking: A unified model and comparison results , 1993, Discret. Event Dyn. Syst..
[11] Kenneth R. Baker,et al. The effects of input control in a simple scheduling model , 1984 .
[12] Karel V. Donselaar. Alternatives for MRP , 1991 .
[13] Michael A. Zazanis,et al. Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..
[14] Hubert Missbauer,et al. Production Planning and Control (PPC) systems including load-oriented order release — Problems and research perspectives , 1993 .
[15] Gerhard Knolmayer,et al. A Widely Acclaimed Method of Load-Oriented Job Release and its Conceptual Deficiencies , 1991 .
[16] William L. Maxwell,et al. Theory of scheduling , 1967 .
[17] Arnoldo C. Hax,et al. Production and inventory management , 1983 .
[18] Jwm Will Bertrand,et al. The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .
[19] Upendra Dave,et al. Heuristic Scheduling Systems , 1993 .
[20] B. J. Berkley,et al. Tandem queues and kanban-controlled lines , 1991 .
[21] Thom J. Hodgson,et al. Optimal hybrid push/pull control strategies for a parallel multistage system: Part II , 1991 .
[22] Marc Lambrecht,et al. Buffer Stock Allocation in Serial and Assembly Type of Production Lines , 1990 .
[23] van Kh Karel Donselaar,et al. The use of MRP and LRP in a stochastic environment , 1992 .
[24] Marc Lambrecht,et al. JIT and constraint theory: the issue of bottleneck management , 1988 .
[25] M. Koster,et al. Approximation of Flow Lines with Integrally Controlled Buffers , 1988 .
[26] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[27] Hans-Peter Wiendahl,et al. Application of load-oriented manufacturing control in industry , 1992 .
[28] Jeff Cox,et al. The Goal: A Process of Ongoing Improvement , 1984 .
[29] Mauricio G. C. Resende,et al. A scheduling rule for job release in semiconductor fabrication , 1988 .
[30] John B. Jensen,et al. An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops , 1993 .
[31] Warren W. Fisher,et al. Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .
[32] R. A. Dudek,et al. A categorized survey of the JIT literature , 1991 .
[33] John Harhen,et al. Mrp/mrp Ii , 1988, Computer-Aided Production Management.
[34] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[35] de Mbm René Koster,et al. Capacity Oriented Analysis and Design of Production Systems , 1989 .
[36] Wolfgang Bechte. Theory and practice of load-oriented manufacturing control , 1988 .
[37] J. A. Buzacott,et al. Queueing models of Kanban and MRP controlled production systems , 1989 .
[38] Debasis Mitra,et al. Analysis of a Kanban discipline for cell coordination in production lines , 1990 .
[39] Peter O'Grady,et al. INTEGRATING KANBAN TYPE PULL SYSTEMS AND MRP TYPE PUSH SYSTEMS: INSIGHTS FROM A MARKOVIAN MODEL , 1992 .
[40] Yves Dallery,et al. A unified modeling of Kanban systems using petri nets , 1991 .
[41] David J. Miller,et al. Simulation of a semiconductor manufacturing line , 1990, CACM.
[42] Lee J. Krajewski,et al. Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .
[43] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[44] Lawrence D. Fredendall,et al. Load smoothing by the planning and order review/release systems: A simulation experiment , 1991 .
[45] G. Zäpfel,et al. New concepts for production planning and control , 1993 .
[46] J. Wijngaard,et al. Local and Integral Control of Workload , 1989 .
[47] Fong-Yuen Ding,et al. A modified MRP for a production system with the coexistence of MRP and kanbans , 1991 .
[48] Hans-Peter Wiendahl,et al. Load-Oriented Manufacturing Control , 1994 .
[49] J. A. Buzacott,et al. Modelling Flexible Manufacturing Systems , 1989 .
[50] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[51] H. Wiendahl. Die belastungsorientierte Fertigungssteuerung , 1992 .
[52] Kut C. So,et al. The impact of buffering strategies on the performance of production line systems , 1990 .
[53] Vincent A. Mabert,et al. AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .