Analysis of Waste Generation Characteristics during New Apartment Construction—Considering the Construction Phase
暂无分享,去创建一个
[1] Hjh Jos Brouwers,et al. Construction Waste: Quantification and Source Evaluation , 1996 .
[2] John M. Halstead,et al. A METHODOLOGY FOR QUANTIFYING THE VOLUME OF CONSTRUCTION WASTE , 1996 .
[3] Seongwon Seo,et al. An Estimation of Construction and Demolition Debris in Seoul, Korea: Waste Amount, Type, and Estimating Model. , 1999, Journal of the Air & Waste Management Association.
[4] Konstantinos Moustakas,et al. Generation and management of construction and demolition waste in Greece—an existing challenge , 2003 .
[5] Nabil Kartam,et al. Environmental management of construction and demolition waste in Kuwait. , 2004, Waste management.
[6] R. Bohne,et al. Projection of Construction and Demolition Waste in Norway , 2007 .
[7] Timothy Townsend,et al. Estimation of regional building-related C&D debris generation and composition: case study for Florida, US. , 2007, Waste management.
[8] Shabbir H Gheewala,et al. Estimation of construction waste generation and management in Thailand. , 2009, Waste management.
[9] Jaime Solís-Guzmán,et al. A Spanish model for quantification and management of construction waste. , 2009, Waste management.
[10] Isabel Martínez Lage,et al. Estimation of the annual production and composition of C&D Debris in Galicia (Spain). , 2010, Waste management.
[11] C Llatas,et al. A model for quantifying construction waste in projects according to the European waste list. , 2011, Waste management.
[12] V. S. Rotter,et al. A system dynamics model for evaluating the alternative of type in construction and demolition waste recycling center – The case of Chongqing, China , 2011 .
[13] Weisheng Lu,et al. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.
[14] Mazlin Mokhtar,et al. Construction waste minimisation comparing conventional and precast construction (Mixed System and IBS) methods in high-rise buildings: A Malaysia case study , 2012 .
[15] Pilar Mercader-Moyano,et al. Selective classification and quantification model of C&D waste from material resources consumed in residential building construction , 2013, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[16] Jiayuan Wang,et al. A model for estimating construction waste generation index for building project in China , 2013 .
[17] Weisheng Lu,et al. Construction waste management policies and their effectiveness in Hong Kong: A longitudinal review , 2013 .
[18] Weisheng Lu,et al. Estimating the Amount of Building-Related Construction and Demolition Waste in China , 2014 .
[19] Tao Ding,et al. Estimation of building-related construction and demolition waste in Shanghai. , 2014, Waste management.
[20] Diogo Hf Paz,et al. Forecasting of construction and demolition waste in Brazil , 2016, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[21] J. Fellner,et al. A method for determining buildings’ material composition prior to demolition , 2016 .
[22] Marta Castilho Gomes,et al. Demolition waste generation for development of a regional management chain model. , 2016, Waste management.
[23] Takeshi Fujiwara,et al. Construction and demolition waste generation rates for high-rise buildings in Malaysia , 2016, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[24] Anthony Halog,et al. Strategies for minimizing construction and demolition wastes in Malaysia , 2017 .
[25] Won-Hwa Hong,et al. An estimation framework for building information modeling (BIM)-based demolition waste by type , 2017, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[26] H. Moon,et al. The Effects of Data Collection Method and Monitoring of Workers’ Behavior on the Generation of Demolition Waste , 2017, International journal of environmental research and public health.
[27] Won-Hwa Hong,et al. New approach for forecasting demolition waste generation using chi-squared automatic interaction detection (CHAID) method , 2017 .
[28] Weisheng Lu,et al. Identifying factors influencing demolition waste generation in Hong Kong , 2017 .
[29] Kweon-Hyoung Lee,et al. Multi-Family Housing Block Design Strategy Development by BIM-based Energy Performance Analysis , 2018 .
[30] Fernanda Leite,et al. Seven-dimensional automated construction waste quantification and management framework: Integration with project and site planning , 2019, Resources, Conservation and Recycling.