Route Constrained Fleet Scheduling
暂无分享,去创建一个
[1] Pierre N. Robillard,et al. Scheduling with earliest start and due date constraints on multiple machines , 1975 .
[2] Amos Levin. Scheduling and Fleet Routing Models for Transportation Systems , 1971 .
[3] P. Schweitzer,et al. AN ALGORITHM FOR COMBINING TRUCK TRIPS , 1972 .
[4] G. Nemhauser,et al. Integer Programming , 2020 .
[5] M. Bellmore,et al. A Multivehicle Tanker Scheduling Problem , 1971 .
[6] A. Martin-Löf. A Branch-and-Bound Algorithm for Determining the Minimal Fleet Size of a Transportation System , 1970 .
[7] D. R. Fulkerson,et al. Flows in Networks. , 1964 .
[8] M. Segal,et al. The Operator-Scheduling Problem: A Network-Flow Approach , 1974, Oper. Res..
[9] F. Salzborn. Letter to the Editor—A Note on Fleet Routing Models for Transportation Systems , 1972 .
[10] G. Nemhauser,et al. Set Partitioning and Chain Decomposition , 1974 .
[11] Charles ReVelle,et al. Optimal location under time or distance constraints , 1972 .
[12] Fjm Salzborn,et al. MINIMUM FLEET SIZE MODELS FOR TRANSPORTATION SYSTEMS , 1974 .
[13] F. Glover,et al. Finding Minimum Spanning Trees with a Fixed Number of Links at a Node , 1975 .
[14] L. Appelgren. Integer Programming Methods for a Vessel Scheduling Problem , 1971 .
[15] A.H.G. Rinnooy Kan,et al. The machine scheduling problem , 1973 .
[16] William L. Maxwell,et al. Theory of scheduling , 1967 .
[17] C. S. Orloff. A fundamental problem in vehicle routing , 1974, Networks.
[18] Warren H. Thomas,et al. Bus routing in a multi-school system , 1974, Comput. Oper. Res..
[19] Brian W. Kernighan,et al. An Effective Heuristic Algorithm for the Traveling-Salesman Problem , 1973, Oper. Res..
[20] J. C. Miller,et al. A Time-of-Day Model for Aircraft Scheduling , 1972 .