A framework for decision support in production scheduling tasks
暂无分享,去创建一个
[1] Reha Uzsoy,et al. Measuring the Quality of Manufacturing Schedules , 1995 .
[2] J. R. King,et al. The theory-practice gap in job-shop scheduling , 1976 .
[3] Richard J. Koubek,et al. Mapping perceptual and cognitive processing for the effective use of graphical displays in shop floor scheduling tasks , 1995 .
[4] D.H.R. Price,et al. A review of production planning and scheduling in smaller manufacturing companies in the UK , 1994 .
[5] W. R. Allen,et al. Expert Systems and Job Shop Scheduling , 1993 .
[6] Allen Newell,et al. Human Problem Solving. , 1973 .
[7] T. J. Grant,et al. Lessons for O.R. from A.I.: A Scheduling Case Study , 1986 .
[8] Dipak Chaudhuri,et al. Dynamic scheduling—a survey of research , 1993 .
[9] K. Preston White,et al. A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..
[10] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[11] Fred D. Davis,et al. Determinants of Decision Rule Use in a Production Planning Task , 1995 .
[12] Sabah U. Randhawa,et al. An Investigation of the Applicability of Expert Systems to Job Shop Scheduling , 1990, Int. J. Man Mach. Stud..
[13] Joseph Sharit,et al. Supervisory Control of a Flexible Manufacturing System , 1985 .
[14] Geoff Buxey,et al. Production scheduling: Practice and theory , 1989 .
[15] T. W. van der Schaaf. Human Recovery of Errors in Man-Machine Systems , 1995 .
[16] D. Norman. The psychology of everyday things", Basic Books Inc , 1988 .
[17] J. Rassmusen,et al. Information Processing and Human - Machine Interaction: An Approach to Cognitive Engineering , 1986 .
[18] Thomas E. Morton,et al. Heuristic scheduling systems : with applications to production systems and project management , 1993 .
[19] P. Levy,et al. Situational and individual determinants of feedback seeking: a closer look at the process , 1995 .
[20] Heimo H. Adelsberger,et al. Expert systems in production scheduling , 1987 .
[21] Jerzy Kyparisis,et al. Single machine scheduling research , 1987 .
[22] Harold E. Price,et al. The Allocation of Functions in Systems , 1985 .
[23] B Kleinmuntz,et al. Why we still use our heads instead of formulas: toward an integrative approach. , 1990, Psychological bulletin.
[24] Oliver W. Wight,et al. Production and inventory management in the computer age , 1974 .
[25] Jürgen Dorn,et al. Reactive scheduling: improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning , 1995, Int. J. Hum. Comput. Stud..
[26] Rolf A. Zwaan,et al. Applied Cognitive Psychology , 2022 .
[27] Robert H. Storer,et al. Robustness Measures and Robust Scheduling for Job Shops , 1994 .
[28] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[29] Vincent C. S. Wiers,et al. The complexity of scheduling in practice , 1996 .
[30] J. Shaoul. Human Error , 1973, Nature.
[31] Vincent C. S. Wiers,et al. A quantitative field study of the decision behaviour of four shopfloor schedulers , 1996 .
[32] Penelope M. Sanderson,et al. The Human Planning and Scheduling Role in Advanced Manufacturing Systems: An Emerging Human Factors Domain , 1989 .
[33] Ranga V. Ramasesh. Dynamic job shop scheduling: A survey of simulation research , 1990 .
[34] Kenneth N. McKay,et al. Schedulers & Planners: What and How Can We Learn From Them , 1995 .
[35] Gerardo Patriotta,et al. Disassembling Frames on the Assembly Line: The Theory and Practice of the New Division of Learning in Advanced Manufacturing , 1996 .
[36] Jwm Will Bertrand,et al. Production control and information systems for component-manufacturing shops , 1981 .
[37] J. Richardson,et al. Cognitive aspects of computer-supported tasks , 1992 .
[38] Lisanne Bainbridge,et al. Ironies of automation , 1982, Autom..
[39] Elizabeth Szelke,et al. Knowledge-based reactive scheduling , 1994 .
[40] James T. Reason,et al. Cognitive failures and accidents , 1990 .