The copy-exactly ramp-up strategy: trading-off learning with process change

Production ramp-up is the period of time during which a manufacturing process is scaled up from a small laboratory-like environment to high-volume production. During this scale-up, the firm needs to overcome the numerous discrepancies between how the process is specified to operate as written in the process recipe and how it actually is operated at large volume. The reduction of these discrepancies, a process that we will refer to as learning, will lead to improved production yields and higher output. In addition to its learning effort, however, the firm also attempts to change the process recipe itself, which can be in direct conflict with the learning objective. We formalize this intertemporal tradeoff between learning and process change in the form of a dynamic optimization problem. Our model explains the idea of a "copy-exactly" ramp-up, which freezes the process for some time period, i.e., does not allow for any change in the process. Mathematically, this corresponds to a process improvement policy which delays process changes, thereby exhibiting a nonmonotone trajectory, which we show to be optimal if the initial knowledge level is low, the lifecycle short and demand growth is steep, and learning is difficult.

[1]  Charles H. Fine,et al.  Dynamic Process Improvement , 1989, Oper. Res..

[2]  S. Rajagopalan,et al.  Process Improvement, Quality, and Learning Effects , 1998 .

[3]  Cheryl Gaimon,et al.  Planning Information Technology-Knowledge Worker Systems , 1997 .

[4]  Stefan H. Thomke,et al.  Project Dreamcast: Serious Play at Sega Enterprises Ltd. (A) , 1999 .

[5]  F. Bass A new product growth model for consumer durables , 1976 .

[6]  Olvi L. Mangasarian,et al.  Nonlinear Programming , 1969 .

[7]  T. P. Wright,et al.  Factors affecting the cost of airplanes , 1936 .

[8]  Frank M. Bass,et al.  A New Product Growth for Model Consumer Durables , 2004, Manag. Sci..

[9]  Suresh Chand,et al.  Capacity Allocation for Dynamic Process Improvement with Quality and Demand Considerations , 1996, Oper. Res..

[10]  C. Terwiesch,et al.  Learning and process improvement during production ramp-up , 1998 .

[11]  Thomas R. Gulledge,et al.  Investment in knowledge: a generalization of learning by experience , 1994 .

[12]  M. Spence The Learning Curve and Competition , 1981 .

[13]  W. Zangwill,et al.  Toward a Theory of Continuous Improvement and the Learning Curve , 1998 .

[14]  Edward G. Anderson,et al.  The Nonstationary Staff-Planning Problem with Business Cycle and Learning Effects , 2001, Manag. Sci..

[15]  Ashoka Mody Firm strategies for costly engineering learning , 1989 .

[16]  Aleda V. Roth,et al.  The Knowledge Factory for accelerated learning practices , 1994 .

[17]  G. Thompson,et al.  Optimal Control Theory: Applications to Management Science and Economics , 2000 .

[18]  Karl T. Ulrich,et al.  Special Issue on Design and Development: Product Development Decisions: A Review of the Literature , 2001, Manag. Sci..

[19]  M. Petit Dynamic optimization. The calculus of variations and optimal control in economics and management : by Morton I. Kamien and Nancy L. Schwartz. Second Edition. North-Holland (Advanced Textbooks in Economics), Amsterdam and New York, 1991. Pp. xvii+377. ISBN0-444- 01609-0 , 1994 .

[20]  K. Eisenhardt,et al.  Accelerating Adaptive Processes: Product Innovation in the Global Computer Industry , 1995 .

[21]  F. Lévy Adaptation in the Production Process , 1965 .

[22]  Cheryl Gaimon,et al.  Improving Manufacturing Performance Through Process Change and Knowledge Creation , 2000 .

[23]  Luk N. Van Wassenhove,et al.  Behind the Learning Curve: Linking Learning Activities to Waste Reduction , 2000 .

[24]  R. Vidal Dynamic optimization: The calculus of variations and optimal control in economics and management: Morton I. KAMIEN and Nancy L. SCHWARTZ Volume 4 in: Dynamic Economics: Theory and Applications, North-Holland, New York, 1981, xi + 331 pages, Dfl.90.00 , 1982 .

[25]  Chris J. McDonald,et al.  The Evolution of Intel s Copy EXACTLY ! Technology Transfer Method , 1998 .

[26]  D. Mowery,et al.  Process Innovation and Learning by Doing in Semiconductor Manufacturing , 1998 .

[27]  V. Mahajan,et al.  Managing New Product Definition in Highly Dynamic Environments , 1998 .

[28]  C. Terwiesch,et al.  The economics of yield-driven processes , 1999 .

[29]  L. Argote,et al.  Learning Curves in Manufacturing , 1990, Science.

[30]  Charles H. Fine Quality Improvement and Learning in Productive Systems , 1986 .