Improving Synchronization in an Air and High-Speed Rail Integration Service via Adjusting a Rail Timetable: A Real-World Case Study in China

Air and high-speed rail (AH) integration services are gaining ground with the development of the high-speed railway and airline industries. A well-designed feeder train timetable with good synchronization is of great significance in an AH integration service, because it can improve the connectivity at transfer nodes and offer more opportunities for intermodal passengers to travel. In this study, we propose a multi-objective model of a feeder railway timetable problem in an AH integration service to improve synchronization. The aims of the optimization model are to maximize the number of synchronizations and the coverage of synchronized flights, as well as to minimize the transfer penalties of passengers. We focus on a scenario of a partial subnetwork in which one direction of a two-direction railroad line with one transfer station is considered. The model is applied to Shijiazhuang Zhengding International Airport, China. The results illustrate the effectiveness of the approach developed in the paper.

[1]  Jin Wang,et al.  Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor , 2018, Journal of Advanced Transportation.

[2]  Zhi-Chun Li,et al.  Forecasting passenger travel demand for air and high-speed rail integration service: A case study of Beijing-Guangzhou corridor, China , 2016 .

[3]  Janny Leung,et al.  Optimizing Timetable Synchronization for Rail Mass Transit , 2008, Transp. Sci..

[4]  Yousef Shafahi,et al.  A practical model for transfer optimization in a transit network: Model formulations and solutions , 2010 .

[5]  Makoto Okumura,et al.  Air-Rail Inter-modal Network Design under Hub Capacity Constraint , 2007 .

[6]  P. Siarry,et al.  Multiobjective Optimization: Principles and Case Studies , 2004 .

[7]  Wolfgang Grimme Experiences with Advanced Air-Rail Passenger Intermodality – The case of Germany , 2007 .

[8]  Xueming Chen,et al.  Airline and railway disintegration in China: the case of Shanghai Hongqiao Integrated Transport Hub , 2017 .

[9]  Paul Chiambaretto,et al.  Air–rail intermodal agreements: Balancing the competition and environmental effects , 2012 .

[10]  Boaz Golany,et al.  Creating bus timetables with maximal synchronization , 2001 .

[11]  Anitha Eranki,et al.  A Model to Create Bus Timetables to Attain Maximum Synchronization Considering Waiting Times at Transfer Stops , 2004 .

[12]  Xuesong Zhou,et al.  Single-Track Train Timetabling with Guaranteed Optimality: Branch-and-Bound Algorithms with Enhanced Lower Bounds , 2007 .

[13]  Huijun Sun,et al.  Last train timetabling optimization and bus bridging service management in urban railway transit networks , 2019, Omega.

[14]  Wolfgang Domschke,et al.  Schedule synchronization for public transit networks , 1989 .

[15]  David Banister,et al.  Airline and railway integration , 2006 .

[16]  Ziyou Gao,et al.  Equity-based timetable synchronization optimization in urban subway network , 2015 .

[17]  Thibaut Lavril,et al.  Measuring the willingness-to-pay of air-rail intermodal passengers , 2013 .

[18]  Andreas Wald,et al.  Intermodal integration in air transportation: status quo, motives and future developments , 2011 .

[19]  Ziyou Gao,et al.  Timetable coordination of first trains in urban railway network: A case study of Beijing , 2016 .

[20]  Xia Yang,et al.  Coordination Optimization of the First and Last Trains' Departure Time on Urban Rail Transit Network , 2013 .

[21]  Ampol Karoonsoontawong,et al.  Branch-and-Bound-Based Local Search Heuristics for Train Timetabling on Single-Track Railway Network , 2017 .

[22]  Christian Liebchen,et al.  The First Optimized Railway Timetable in Practice , 2008, Transp. Sci..

[23]  Matteo Fischetti,et al.  Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..

[24]  M. Pilar Socorro,et al.  The effects of airline and high speed train integration , 2013 .

[25]  M. Schröder,et al.  Optimization of Transfer Quality in Regional Public Transit , 2006 .

[26]  Changmin Jiang,et al.  Determinants of partnership levels in air-rail cooperation , 2018, Journal of Air Transport Management.

[27]  Dewei Li,et al.  Optimal synchronization and coordination of actual passenger-rail timetables , 2019, J. Intell. Transp. Syst..

[28]  Huijun Sun,et al.  Multiperiod-based timetable optimization for metro transit networks , 2017 .

[29]  Anming Zhang,et al.  Air-Rail Cooperation and Multiple-Airports System: A Revenue-Sharing Mechanism between Air and Rail Sectors , 2018 .

[30]  James H. Bookbinder,et al.  Transfer Optimization in a Transit Network , 1992, Transp. Sci..

[31]  Yasmin A. Rios-Solis,et al.  Synchronization of bus timetabling , 2012 .

[32]  Anming Zhang,et al.  High-speed rail and air transport competition and cooperation: A vertical differentiation approach , 2016 .