Optimal Operation of Virtual Power Plant in a Day Ahead Market

The necessity for Renewable Energy Resources (RES) has become a major issue due to the shortage of adequate fossil fuels recently. In addition to fossil fuel shortages, global warming is also an anxiety for a lot of countries and companies. These problems have led to the addition of a large number of renewable energy sources to modern distribution systems. However, due to the high integration of RES to these systems and the intermittent characteristic of sources such as wind and solar, it causes variable production and uncertainty in the power system. It is proposed as a solution to gather these resources together in order to solve the problems caused by the changeable outputs of these resources. Virtual Power Plant (VPP) is described as the management of distributed generation facilities, energy storage systems and controllable loads by an Energy Management System (EMS). In this study, the VPP model consists of renewable energy sources such as wind power plant (WPP), solar power plant (SPP), biogas power plant (BPP) and pumped hydro storage plant (PHSP) as an energy storage system (ESS). The aim of the VPP is to maximize the net daily profit in a 24 h time interval. The proposed mixed integer linear programming (MILP) optimization problem is modeled in GAMS software and solved using CPLEX.

[1]  Christoph Walla,et al.  The optimal size for biogas plants , 2008 .

[2]  Yan Lu,et al.  A CVaR-robust-based multi-objective optimization model and three-stage solution algorithm for a virtual power plant considering uncertainties and carbon emission allowances , 2019, International Journal of Electrical Power & Energy Systems.

[3]  Luis Baringo,et al.  Day-Ahead Self-Scheduling of a Virtual Power Plant in Energy and Reserve Electricity Markets Under Uncertainty , 2019, IEEE Transactions on Power Systems.

[4]  Igor Kuzle,et al.  Virtual power plant mid-term dispatch optimization , 2013 .

[5]  Hossam A. Gabbar,et al.  Optimal scheduling of interconnected micro energy grids with multiple fuel options , 2016 .

[6]  Ali Mohammad Ranjbar,et al.  Optimal operation of a virtual power plant in frequency constrained electricity market , 2019, IET Generation, Transmission & Distribution.

[7]  Zhongfu Tan,et al.  A bi-level stochastic scheduling optimization model for a virtual power plant connected to a wind–photovoltaic–energy storage system considering the uncertainty and demand response , 2016 .

[8]  M. Rahimiyan,et al.  Strategic Bidding for a Virtual Power Plant in the Day-Ahead and Real-Time Markets: A Price-Taker Robust Optimization Approach , 2016, IEEE Transactions on Power Systems.

[9]  Z. Tan,et al.  Application of CVaR risk aversion approach in the dynamical scheduling optimization model for virtual power plant connected with wind-photovoltaic-energy storage system with uncertainties and demand response , 2017 .

[10]  Mohammad Javad Kasaei Energy and operational management of virtual power plant using imperialist competitive algorithm , 2018 .

[11]  H. Saboori,et al.  Virtual Power Plant (VPP), Definition, Concept, Components and Types , 2011, 2011 Asia-Pacific Power and Energy Engineering Conference.

[12]  Ozan Erdinc,et al.  An adaptive load dispatching and forecasting strategy for a virtual power plant including renewable energy conversion units , 2014 .

[13]  Hongbo Lian,et al.  Optimal dispatch of virtual power plant using interval and deterministic combined optimization , 2018, International Journal of Electrical Power & Energy Systems.

[14]  Abdullah Akbulut,et al.  Techno-economic analysis of electricity and heat generation from farm-scale biogas plant: Çiçekdağı case study , 2012 .

[15]  Long Bao Le,et al.  A Bidding Strategy for Virtual Power Plants With the Intraday Demand Response Exchange Market Using the Stochastic Programming , 2018, IEEE Transactions on Industry Applications.